Tuesday, April 28, 2020

Pass-On

 
 
  Pass-On
 
Date 04-27-2020
Pass-On Subject D-Shift, Monday April 27th 2020
Pass-On Information -Gator & Collapse checked

-Rope training

-RS20-01 to DES & Station 3

-RS20-01 fueled

Name McCoy/Shealy
Email amccoy
 
     
 
 

Monday, April 27, 2020

Pass-On

 
 
  Pass-On
 
Date 04-26-2020
Pass-On Subject C-Shift
Pass-On Information -All lumber moved from the squads to     replenish the collapse trailer

-Working to place cord on all edge protection to assist securing in place

-Working on unit specific check off sheets

-Rescue Squad 201 left 1/2 of light tower will not light up. Had to turn it on and off multiple times to raise and lower

-Changing our compliment of wood to 8 10ft posts and 8 8ft posts to better facilitate residential structures.

-4 premade t-post kits were constructed  
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Saturday, April 25, 2020

Pass-On

 
 
  Pass-On
 
Date 04-24-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON
 
    Apparatus and SCBA checks
    Station chores complete
    Stokes basket training complete
   
    (2)COVID-19 confirmed case
          (269 & 268)

    Vehicle into the building
          we constructed a 3 post shore inside and
          one T post on the front porch.
          materials used: (6) 4x4x 10' posts, (4)
          matched sets of wedges, (13) 1'x1'x3/4"
          gusset plates, (2) 6"x1'x3/4 gusset plates,
          (1) quick T shore pack, (2) 2x4x10', (1)
          can of passload gas, (5) racks of nails.
          WE NEED A CARD TO BUY REPLACEMENT
          MATERIALS.

Shift complete
               
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Friday, April 24, 2020

Pass-On

 
 
  Pass-On
 
Date 04-23-2020
Pass-On Subject D-Shift, Thursday April 23rd 2020
Pass-On Information -Apparatus checks

-Rope training

-Scheduling worked on for several hours throughout the day.

-U203 with shealy to DES to pick up a skid of gloves and take them to the warehouse.

-Grass mowed

-U203 with shealy to the fire store and then to pick up a spare tote from the warehouse to bring back to the station.

-Spare tote was washed out. It is sitting in the bay air drying.

-M692 swapped out 1 dirty rain coat for 1 clean one. We deconed that rain coat and the 4 others that were laying back there.



1-Box alarm. Food on the stove
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Thursday, April 23, 2020

Pass-On

 
 
  Pass-On
 
Date 04-22-2020
Pass-On Subject C-shift Pass On
Pass-On Information -203 weekly completed w/ no issues found.

-Repaired shore-line outlet on RS20.  Some drove away without unplugging the unit.

-Repaired the small emergency light plug on Collapse 20.  Looks like someone drove away with 203 without unplugging the collapse trailer.

-Rope training and stoke bridle setup options reviewed.

-Citizen dropped off some food for us.  Left on the dining room table.

-Junkins stokes basket removed from big squad.  Does not meet NFPA standards for rope rescue.  Stokes from top compartment moved to its place.
Name Olson / Fraley
Email dolson@washco-md.net
 
     
 
 

Tuesday, April 21, 2020

EDIT: Pass-On

 
 
  Pass-On
 
Date 04-20-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poffenberger ON

    apparatus and SCBA checks
    Checked collapse and gator
    Cleaned and sanitized station
    Fixed the ratchet for the boat trailer
    Inflated Boat 20

(2) PUI decons completed 791 and 752
          Cleaned regulator and face piece
Deconed 2 raincoats from Engine 2. Issued 2
          Replacements.
Gator call to clear spring, canceled in route

Shift complete

Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 04-20-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poffenberger ON

    apparatus and SCBA checks
    Checked collapse and gator
    Cleaned and sanitized station
    Fixed the ratchet for the boat trailer
    Inflated Boat 20

(2) PUI decons completed 791 and 752
          Cleaned regulator and face piece
Gator call to clear spring, canceled in route

Shift complete

Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Monday, April 20, 2020

Pass-On

 
 
  Pass-On
 
Date 04-19-2020
Pass-On Subject D-Shift, Sunday April 19th 2020
Pass-On Information -Apparatus checks

-RS20-01 checked

-Schedule worked on

-Station air filters bought at Lowe's

-Off loaded 225-250 gallons of fuel. Yard tank is FULL and the tote in the shed is half full.

-HM20 fueled
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Saturday, April 18, 2020

Pass-On

 
 
  Pass-On
 
Date 04-18-2020
Pass-On Subject C-Shift
Pass-On Information -HM-All batteries charged

-Meters Labeled with larger labels that         include "A" and "B" markings to avoid confusion going down range

-Lumber consolidated on one shelf

-Water Equipment moved to rack/rear bay floor cleaned up

-Skid Steer tires were inspected, two holes with active leaks were found. Holes were plugged and tires filled.
Trailer tires were found low and filled.
Skid Steer was fueled and taken to the warehouse

-Couch coverings washed

-Boat Motor turned sideways after finding it wedged against the rear door.

Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 04-17-2020
Pass-On Subject B-Shift, Friday April 17th 2020
Pass-On Information -McCoy on at 0400, Hose to MMC due to illness.  

-Hoop on at 0730

-Skid 20 brought to the fire to assist. It was utilized and ended up with a bolt and some nails in tires.

-BS20 washed

-RS20-01, BS20, Skid20 & U203 fueled

-K-12 cleaned from the fire.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Friday, April 17, 2020

Pass-On

 
 
  Pass-On
 
Date 04-16-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poffinberger ON

    SCBA and Equipment checks
    Apparatus checks
    Yard work complete
    Cylinders filled
    Rope training
    Moved beds from HCC to MMC

1 PUI decon of 752
Commercial building fire, south end shopping ctr
    Cylinders filled
Water rescue, canceled in route
2 alarm commercial building fire on oak ridge
    Cylinders filled
    K-12 used on trench cutting roof.
   
MCcoy relieved Hose Early. 0530ish I was taken to the hospital for evaluation. All tests came back negative. Dr. thinks I have a GI bug.

Shift complete

   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Thursday, April 16, 2020

Pass-On

 
 
  Pass-On
 
Date 04-15-2020
Pass-On Subject D-Shift, Wednesday April 15th 2020
Pass-On Information -U203 checked

-Rope training

-MCC2 picked up and taken to county roads, then brought back to the warehouse

-RS20-01 fueled

-2 Decons
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Wednesday, April 15, 2020

Pass-On

 
 
  Pass-On
 
Date 04-14-2020
Pass-On Subject C-shift Pass On
Pass-On Information -Radio maintenance inventoried all portable radios.  More to come on this in the coming weeks.

-Older portable batteries are in the process of being checked for their longevity of use.  Potential to be phased out in the future.
-BS20 weekly completed.  Through reorg completed.

-1 adult, 1 pedi, and 1 infant BVM picked up.  Infant placed in RS20 EMS bag and others placed in cabinet.

-HazMat radios reconditioned.  2 chargers will be placed in HM20 for these to be charged.
Name Olson / Fraley
Email EngineDriver71@comcast.net
 
     
 
 

Monday, April 13, 2020

Pass-On

 
 
  Pass-On
 
Date 04-12-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON
 
     Sterilized and cleaned the station

     SCBA and Equipment checks
   
     Weekly on 201

     Quarterly waxing and polishing of HM-20

     1 PUI decon with aerosolized treatment. 692
           Face piece and regulator cleaned

     Body recovery assisting MSP.
           Gator 20 washed
           Stokes basket sanitized and left out to dry
           Fuel is good
           Removed a seal on blue attendant rigging
                 bag but didn't use any equipment.
                 Bag came of squad 20. Did not
                 replace seal.

    2 cylinders need filled, beside stairs off HM-20

Shift Complete



     
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Sunday, April 12, 2020

Pass-On

 
 
  Pass-On
 
Date 04-11-2020
Pass-On Subject D-Shift, Saturday April 11th 2020
Pass-On Information -HM20 checked

-Apparatus checks

-Station and apparatus disinfected

-BS20 fueled

-1 box alarm. Used a cylinder and hook. Cylinder refilled

-1 watercraft in distress. Cancelled enroute
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Saturday, April 11, 2020

Pass-On

 
 
  Pass-On
 
Date 04-10-2020
Pass-On Subject C-Shift
Pass-On Information -Rs-20 checked washed and waxed

-Hazmat Getach causing cad issues on 4/9 seems to be resolved after reset

-Starting Monday in station training has been authorized with DES staff only

-Spare boat motor taken to warehouse

-Skid of fluff brought back

-B suite was replaced due to two small holes.
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Thursday, April 9, 2020

Pass-On

 
 
  Pass-On
 
Date 04-08-2020
Pass-On Subject A- Crew
Pass-On Information Hose and Poffinberger ON

    Equipment and SCBA's checked
   
    Cleaned and sanitized station
   
    Weekly Check on 203
   
    Spring maintenance completed on mower,
         weed wacker, and blower.
   
    Mowed grass
   
    Blew off the apron
   
    Took 3 skids of surplus equipment, chairs and
         nails to Phoenix.
   
    Three large pop-ups placed on the rack above
         the generators at the station.
   
    Confirmed COVID 19 case... deconed 752

    Washed HM-20

    Confirmed COVID 19 case... deconed 751

Shift complete
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Wednesday, April 8, 2020

Pass-On

 
 
  Pass-On
 
Date 04-07-2020
Pass-On Subject D-Shift, Tuesday April 7th 2020
Pass-On Information -BS20 & BT20 checked

-RS20-01 & BS20 were waxed and interior cleaned

-New air filter installed on BS20

-McCoy worked on scheduling throughout the day

-Went to HCC to put plastic over the roof vents on the IMT trailer. The vents broke and water was coming in.

-Shealy to the fire store and ECC

-5 rain coats were deconed. 2 were in a bag outside and 3 were dropped off from E4. E4 were given 3 replacement.

-4 Decons

-1 box alarm
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Tuesday, April 7, 2020

Pass-On

 
 
  Pass-On
 
Date 04-06-2020
Pass-On Subject c
Pass-On Information Gator and Collapse checked

Sheds organized (working progress)

Rear tail light replaced on 201

One decon performed 752


Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Saturday, April 4, 2020

Pass-On

 
 
  Pass-On
 
Date 04-03-2020
Pass-On Subject D-Shift, Friday April 3rd 2020
Pass-On Information -RS20 checked

-RS20-01 to the warehouse to tear down the tent and for general cleanup

-1 box alarm

-1 decon

-McCoy work on scheduling

-Shealy took U203 to pick up racks from the warehouse and took them to MMC

-Cleaned up the closet below the stairs

-RS20-01 fueled
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Friday, April 3, 2020

Pass-On

 
 
  Pass-On
 
Date 04-02-2020
Pass-On Subject C-Shift
Pass-On Information one decon performed

equipment moved around at mmc

grass cut

long and sort hitch are on 203

H2S gas came in

Safety Officer and Health Department Director inspected and reviewed our decon process and was impressed/satisfied

Please use incident type 451 and action taken 46 codes when completing decon firehouse reports
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Wednesday, April 1, 2020

Pass-On

 
 
  Pass-On
 
Date 03-31-2020
Pass-On Subject A crew
Pass-On Information Hose and Poff ON

    apparatus and SCBA checks

    cleaned and sanitized station
   
    Weekly Check on BT 20/20A, BS-20 completed
          Filled boat 20 with Air

    assisted Olsen in building gear racks to hang
          rain coats on behind 201.

    tested petrogen torch that had been worked on
          Two spare 02 Cylinders swapped out, one
                was totally empty and the other only
                had 500 psi that we burned in testing
                the torch and fittings. Swapped out
                at "ROBERTS OXYGEN"
          Torch did fine, no leaks in the fittings.

    1 PUI and two boomerangs.

    Fueled BS-20

Shift Completed
         
   
   


Name Keith Hose
Email Khose@washco-md.net