Sunday, March 29, 2020

EDIT: Pass-On

 
 
  Pass-On
 
Date 03-28-2020
Pass-On Subject B-shift
Pass-On Information Hose (24 OT) and Hoop

    Decontaminated and cleaned station
    Apparatus and SCBA checks complete

    Hazmat 20 weekly check complete
          Calibrated meters
          HM-20 3 (5 gas) HCN sensor failed      
                replaced with spare 2
          Meters all zeroed and peaks cleared
          RID EYE battery charged
 
    HCN Cal gas is low, Morgan has been notified

    (3)  PUI decontaminations
          Face piece cleaned
          Used another 45 min cylinder off RS-201

    Finished cleaning and blowing out petrogen
          torch tip. It should be tested before going
          back in service. A lot of the ports were
          Clogged with slag.


Shift complete

         
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 03-28-2020
Pass-On Subject B-shift
Pass-On Information Hose (24 OT) and Hoop

    Decontaminated and cleaned station
    Apparatus and SCBA checks complete

    Hazmat 20 weekly check complete
          Calibrated meters
          HM-20 3 (5 gas) HCN sensor failed      
                replaced with spare 2
          Meters all zeroed and peaks cleared
          RID EYE battery charged
 
    HCN Cal gas is low, Morgan has been notified

    (2) PUI decontaminations
          Face piece cleaned
          Used another 45 min cylinder off RS-201

    Finished cleaning and blowing out petrogen
          torch tip. It should be tested before going
          back in service. A lot of the ports were
          Clogged with slag.


Shift complete

         
Name Keith Hose
Email Khose@washco-md.net