Saturday, August 8, 2020

Pass-On

 
 
  Pass-On
 
Date 08-08-2020
Pass-On Subject A Shift Pass-on
Pass-On Information HM 20 weekly checkoff completed

new air fitting placed on HM20 air line.

Air pressure from tank air on the hazmat is 175 pis you need to use a regulator when using the air tools to prevent damaging them. the fitting to be able to use the the regulator with the air tools is in the top tool drawer on the hazmat.

HM 20 was washed.

HM 20 was fueled at county roads. when the rig reaches 3/4 tank of fuel it needs to be refueled before returning to the station no exceptions stop being lazy!

station chores were completed.


                           --- CALLS---

117 Summit ave. vehicle into a building. no services needed CO.20 placed in-service.


Name Clay Shealy
Email cshealy@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 08-07-2020
Pass-On Subject C-Shift
Pass-On Information Rescue squad 20 checked-nothing noted, washed

Boat motor repaired, Boat 20 now in service.

Gutters assessed and found no blocks, simple a water volume issue. Need to be re directed elsewhere.

Dirty pump off performed, two barrels left at the scene for cleaning contractor. Hazmat re stocked. Air fitting solution being worked on by Olson.

RS 201 fueled at county roads.
Name Fraley/Hose
Email cfraley@washco-md.net