Monday, May 25, 2020

Pass-On

 
 
  Pass-On
 
Date 05-24-2020
Pass-On Subject C-shift Pass On
Pass-On Information Classroom was setup for upcoming decon assignment.  Please leave it in the current configuration.  More info to come.

Responded to TT MVA with heavy entrapment.  100+ gallons of diesel offloaded after pt removed.  Offload pump was unable to move the diesel up the hill.  Portable pump placed in system as rely pump.  Needed to take filter adapters apart to build adapter on scene to get hoses to connect.  After return to station a filter adapters returned to normal and double male and double female adapters w/ shutoffs build and placed on unit.

Weekly completed on RS20-01.  
-Cutters Edge seems to be puking bar oil.  Cleaned and oil adjusted down to almost closed.  Keep an eye on it.  
-Please remember to refill the mix fuel cans when they get to ½.  Both were almost empty.  
-All cribbing is now on officers side over wheels (step chocks fell over and were blocking the extrication compartment door from opening).  
-Extra hand tools (shovels, trash hook, etc) moved to top shelf in drivers side over the wheel compartment.  
-Stokes with new bridle setup added.

Some equipment was moved around on HM20.  
-Trash cans and buckets from decon compartment up top w/ cones.  
-Wheeled cart added to decon compartment.  Handle can be attached with snap clip.
-Body bags removed from officers' side rear compartment.  
-Chem pump-off equipment and hydrocarbon fiber absorbent switched (keeps people away from the stay dry).  
-Chlorine kits and drum patching equipment switched (shelf damage from weight of Chlorine kits).
Name Otter / Fraley
Email dolson@washco-md.net