Monday, February 17, 2020

Pass-On

 
 
  Pass-On
 
Pass-On Subject 2-stroke Motor testing
Pass-On Information Hose and OcConnel

    Launch at River Bottom Park. Went up stream
    to dam 5 and back. Motor ran good. Shim
    placement is good.

    Top end of the throttle is tight, but manageable
   
    It runs 21 mph up stream at the current flow
    rate.
    EFI 4-stroke runs the same.

    I would like to leave this on as primary right
    right now, but it's something we should all
    discuss. It matters nothing to me.

    Only differences: manual trim, lighter, shifter
    placement and it jumps up on plane faster.

    Lift and lock the motor is your going to drag
    drag the motor past the roller.

    After use maintenance is complete, gas tank
    filled, oil filled, and greased.

Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 02-16-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poffinberger ON
     Apparatus and SCBA check
     RS-201 Checked
         -5gas meter needs calibrated. H2S gas is
           empty. Will calibrate when new gas comes
          in.
         -All gas equipment ran and refueled
         -4 gas meter calibrated and zeroed
     
     Mixed fuel added to the small 50:1 can, filled      
     several old true fuel cans. They are on top the
     flammable cabinet.
     
     Fueled RS-201
     
**  Woodbridge Drive    House Fire    RS-201
     canceled in route

**  General Lee Dr.       House Fire     RS-201
     canceled in route

Shift Complete
Name Keith Hose
Email Khose@washco-md.net