Monday, November 4, 2019

Pass-On

 
 
  Pass-On
 
Date 11-03-2019
Pass-On Subject D-Shift, Sunday November 2nd 2019
Pass-On Information -Pulled con. space equipment off and preformed a function test. Test the com system and tested the coms on all lines.
-Air cart on RS20 is OOS. It will be fixed on C shift. Air cart from Collapse 20 placed on RS20
-RS20-01 checked, light tower still OOS. Meters calibrated and charged
-Some equipment on RS20-01 driver side first compartment was rearranged. Some equipment from the top shelf and the middle shelf was swapped. This is to make the EMS equipment more accessible.
Name Austin McCoy
Email amccoy@washco-md.net