Sunday, December 1, 2019

Pass-On

 
 
  Pass-On
 
Date 11-30-2019
Pass-On Subject C-shift Pass On
Pass-On Information -HM20 checked with no new issues found with rig.  Batteries for RIIDEye, MX6 meters, and portable radios all found low.  Will begin to charge all on both Saturday and following Wednesday shift to keep battery levels up.
-Plow checked and ready for Old Man Winter.  Placed in a position to mount on Sup20-03 when needed.
-Organized pile of equipment that was behind RS20.  These items will be moved to Phoenix or placed in their respective location in the station next week.
-2nd pallet jack moved to shed by fuel pump.
Name Otter
Email EngineDriver71@comcast.net