Sunday, November 3, 2019

Pass-On

 
 
  Pass-On
 
Date 11-02-2019
Pass-On Subject C-Shift
Pass-On Information -RS20-01 fueled
-Apparatus checks
-HM20 checked. Meters calibrated and charged. Rid eye charged
-Continued station clean up
-Loaded U203 full of stuff and took the stuff to the warehouse.
-Floors swept and mopped, bay floor blown out, classroom cleaned
-Red boat placed on top of the other boat.
-Removed tote and drum from U203. That is now in the shed.
-Grain bin rescue device placed on U203
-Skid of absorbent placed on U203 for the winter season.
Name Austin McCoy
Email amccoy@washco-md.net