| |  | Pass-On |
| | | Date | 11-02-2019 | | Pass-On Subject | C-Shift | | Pass-On Information | -RS20-01 fueled -Apparatus checks -HM20 checked. Meters calibrated and charged. Rid eye charged -Continued station clean up -Loaded U203 full of stuff and took the stuff to the warehouse. -Floors swept and mopped, bay floor blown out, classroom cleaned -Red boat placed on top of the other boat. -Removed tote and drum from U203. That is now in the shed. -Grain bin rescue device placed on U203 -Skid of absorbent placed on U203 for the winter season. | | Name | Austin McCoy | | Email | amccoy@washco-md.net |
| | | | | |
|