Sunday, May 12, 2019

EDIT: Pass-On

 
 
  Pass-On
 
Date 05-10-2019
Pass-On Subject C-Shift
Pass-On Information •  18 4x4s placed on collapse trailer.  
•  Engulfment cofferdam equipment removed from collapse trailer and placed on pallet and placed behind small squad.
•  (2) header/sole sets premade to 4' and placed in collapse trailer w/ wedge packs attached.  Stored in rear with wallers.
•  (1) Paslode gun OOS.  Would not fire.
•  Extra 4x4 lumber placed on rack behind hazmat unit.
Name David Olson
Email EngineDriver71@comcast.net
Upload Photo Header-Sole Setup.jpg