Sunday, August 16, 2020

Pass-On

 
 
  Pass-On
 
Date 08-15-2020
Pass-On Subject B Shift Pass On
Pass-On Information -HM20 weekly completed.  The LCD is still slow to start but is quicker with the survey nozzle installed and not the rain cap.  Recommend this be the standard setup for a faster startup.

-Chlorine Safety (TRANSCAER) and new rope equipment training completed.  New rope equipment training to be conducted 8/17-8/21.

-Assisted Co10 with a CO incident.  Measured 11-15ppm for a 45 minute duration with the MX6 meters.  Both meters were re-calibrated upon return to the station.
Name Otter
Email dolson@washco-md.net