| |  | Pass-On |
| | | Date | 11-12-2019 | | Pass-On Subject | A-crew | | Pass-On Information | Hose and Poffinberger ON Checked equipment and Boats I-81 N Fuel spill HM 20 Used 25 bags of Sorbent W to contain and Absorb the Residual diesel on the roadway. Restocked Sorbent W HFD came and took SQ 20 to training. We didn't make it due to the fuel spill. Station Choirs complete Structural collapse to Cortland Apartments built a Two post shore per the structural Engineer on scene. Used: (4) 4x4x10' posts (10) gusset plates (2) packs of matched wedges (2) full 4x8x1/2" sheets of plywood. (4) sticks of framing nails Replaced: (10) gusset plates (2) 4x4x10' posts Told Otter what they needed to buy to replace what we used. Shift complete. | | Name | Keith Hose | | Email | Khose@washco-md.net |
| | | | | |
|