Wednesday, November 13, 2019

Pass-On

 
 
  Pass-On
 
Date 11-12-2019
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON

Checked equipment and Boats

I-81 N   Fuel spill   HM 20

    Used 25 bags of Sorbent W to contain and
    Absorb the Residual diesel on the roadway.

Restocked Sorbent W

HFD came and took SQ 20 to training. We didn't make it due to the fuel spill.

Station Choirs complete

Structural collapse to Cortland Apartments
    built a Two post shore per the structural
    Engineer on scene.
    Used:
    (4) 4x4x10' posts
    (10) gusset plates
    (2) packs of matched wedges
    (2) full 4x8x1/2" sheets of plywood.
    (4) sticks of framing nails
Replaced:

    (10) gusset plates
    (2)   4x4x10' posts

Told Otter what they needed to buy to replace what we used.

Shift complete.    
Name Keith Hose
Email Khose@washco-md.net