Date 04-24-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON
 
    Apparatus and SCBA checks
    Station chores complete
    Stokes basket training complete
   
    (2)COVID-19 confirmed case
          (269 & 268)

    Vehicle into the building
          we constructed a 3 post shore inside and
          one T post on the front porch.
          materials used: (6) 4x4x 10' posts, (4)
          matched sets of wedges, (13) 1'x1'x3/4"
          gusset plates, (2) 6"x1'x3/4 gusset plates,
          (1) quick T shore pack, (2) 2x4x10', (1)
          can of passload gas, (5) racks of nails.
          WE NEED A CARD TO BUY REPLACEMENT
          MATERIALS.

Shift complete
               