| |  | Pass-On |
| | | Date | 04-24-2020 | | Pass-On Subject | A-crew | | Pass-On Information | Hose and Poffinberger ON Apparatus and SCBA checks Station chores complete Stokes basket training complete (2)COVID-19 confirmed case (269 & 268) Vehicle into the building we constructed a 3 post shore inside and one T post on the front porch. materials used: (6) 4x4x 10' posts, (4) matched sets of wedges, (13) 1'x1'x3/4" gusset plates, (2) 6"x1'x3/4 gusset plates, (1) quick T shore pack, (2) 2x4x10', (1) can of passload gas, (5) racks of nails. WE NEED A CARD TO BUY REPLACEMENT MATERIALS. Shift complete | | Name | Keith Hose | | Email | Khose@washco-md.net |
| | | | | |
|
No comments:
Post a Comment