| | | Date | 11-03-2019 | | Pass-On Subject | D-Shift, Sunday November 2nd 2019 | | Pass-On Information | -Pulled con. space equipment off and preformed a function test. Test the com system and tested the coms on all lines. -Air cart on RS20 is OOS. It will be fixed on C shift. Air cart from Collapse 20 placed on RS20 -RS20-01 checked, light tower still OOS. Meters calibrated and charged -Some equipment on RS20-01 driver side first compartment was rearranged. Some equipment from the top shelf and the middle shelf was swapped. This is to make the EMS equipment more accessible. | | Name | Austin McCoy | | Email | amccoy@washco-md.net |
| | | | | |
|