| |  | Pass-On |
| | | Date | 03-31-2020 | | Pass-On Subject | A crew | | Pass-On Information | Hose and Poff ON apparatus and SCBA checks cleaned and sanitized station Weekly Check on BT 20/20A, BS-20 completed Filled boat 20 with Air assisted Olsen in building gear racks to hang rain coats on behind 201. tested petrogen torch that had been worked on Two spare 02 Cylinders swapped out, one was totally empty and the other only had 500 psi that we burned in testing the torch and fittings. Swapped out at "ROBERTS OXYGEN" Torch did fine, no leaks in the fittings. 1 PUI and two boomerangs. Fueled BS-20 Shift Completed | | Name | Keith Hose | | Email | Khose@washco-md.net |
| | | | | |
|
No comments:
Post a Comment