Saturday, April 18, 2020

Pass-On

 
 
  Pass-On
 
Date 04-18-2020
Pass-On Subject C-Shift
Pass-On Information -HM-All batteries charged

-Meters Labeled with larger labels that         include "A" and "B" markings to avoid confusion going down range

-Lumber consolidated on one shelf

-Water Equipment moved to rack/rear bay floor cleaned up

-Skid Steer tires were inspected, two holes with active leaks were found. Holes were plugged and tires filled.
Trailer tires were found low and filled.
Skid Steer was fueled and taken to the warehouse

-Couch coverings washed

-Boat Motor turned sideways after finding it wedged against the rear door.

Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

No comments:

Post a Comment