Tuesday, August 13, 2019

Pass-On

 
 
  Pass-On
 
Date 08-12-2019
Pass-On Subject A-shift
Pass-On Information Apparatus checks and SCBA checks completed
Hazmat Training

We discovered the onboard air fittings on Hazmat 20 are 3/8. All of our pneumatic equipment has 1/4 fittings, the plan is to change some things over to 1/4", however in the meantime we made an adapter. It's in the top draw of the tool box, officer side first roll up compartment.

Station choirs complete

FIRE CALL:

I-70 WB @32mm gasoline leak
Patched the tank and mitigated the spill

Hazmat 20 Fueled

Hazmat issues:
1. There's a bad sensor causing the red compartment open light to flash intermittently.
2. Rear scene lights do not work


This Thursday Matt and I will be working on the zodiac and Chesapeake boats. Gluing and patching, in addition to gluing on the new banners on the Chesapeake


Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Monday, August 12, 2019

Pass-On

 
 
  Pass-On
 
Date 08-11-2019
Pass-On Subject D Shift- Sunday August 11th 2019
Pass-On Information •RS20-01 checked & Fueled
•Added two new foldable benches to the hazmat. They've been placed in the Decon compartment as requested
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Thursday, August 8, 2019

Pass-On

 
 
  Pass-On
 
Date 08-07-2019
Pass-On Subject D-Shift Wednesday August 8th 2019
Pass-On Information -Finished transferring stuff from the old hazmat to the new
-Hazmat drivers training
-RS20-01 fueled
-Added some hand tools and power tool accessories on the hazmat
-Old Hazmat was taken to the warehouse
Name Austin
Email amccoy@washco-md.net
 
     
 
 

Tuesday, August 6, 2019

Re: Apparatus Maintenance Request - Mr Otter

 
  Apparatus Maintenance Request
 
Name Mr Otter
Date 08-06-2019
Email enginedriver71@comcast.net
Unit BT20
Unit Status Out of Service
Description of Issue Boat 20A OOS.  Its flat and won't float...and that's bad.
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 08-06-2019
Pass-On Subject 8-6-19 Pass On
Pass-On Information -Boat 20A bow section found deflated during morning checks.  Inflated and left next to Boat 20 for observation.  By lunch it was showing signs of deflating and by evening it is clearly leaking.  Removed from service.  K. Hose to be notified in AM (8/7).

-New HM20 placed in service.  Equipment moved over and made ready.  Review equipment placement.  Old HM20 placed in far bay, RS20-01 in old HM20 bay.  Once all equipment and supplies are removed it can be moved to Phoenix. Door openers switched between old HM20 and RS20-01.

-Pig-tail for Sup20-03 moved to RS20-01.  We do not have the proper female connection to make new one.  Will need to be picked up.

-Contaminated fuel pump off equipment is on loading dock by rear of Sup20-03.  Discussion was to have that equipment stored on Sup20-03.  Sam to make final decision on manner of storage of equipment.
Name Otter
Email enginedriver71@comcast.net
 
     
 
 

Sunday, August 4, 2019

Pass-On

 
 
  Pass-On
 
Date 08-03-2019
Pass-On Subject D-Shift Saturday August 3rd 2019
Pass-On Information •Picked up another poly barrel
•HM20 checked
Name Austin McCoy
Email Amccoy@washco-md.net
 
     
 
 

Saturday, August 3, 2019

Pass-On

 
 
  Pass-On
 
Date 08-02-2019
Pass-On Subject C-Shift
Pass-On Information -Two level A suites airing out, one needs marked to double glove due to liner being cut out.
-Support 20-05 radio id changed to boat support 20
-HM-20 mounting continued
-RS 20-01 not charging all the way
-All cylinders were filled
-Mister fans taken back to rehab 255
Name Fraley/Olson
Email cfraley@washco-md.net