Date 08-06-2019
Pass-On Subject 8-6-19 Pass On
Pass-On Information -Boat 20A bow section found deflated during morning checks.  Inflated and left next to Boat 20 for observation.  By lunch it was showing signs of deflating and by evening it is clearly leaking.  Removed from service.  K. Hose to be notified in AM (8/7).

-New HM20 placed in service.  Equipment moved over and made ready.  Review equipment placement.  Old HM20 placed in far bay, RS20-01 in old HM20 bay.  Once all equipment and supplies are removed it can be moved to Phoenix. Door openers switched between old HM20 and RS20-01.

-Pig-tail for Sup20-03 moved to RS20-01.  We do not have the proper female connection to make new one.  Will need to be picked up.

-Contaminated fuel pump off equipment is on loading dock by rear of Sup20-03.  Discussion was to have that equipment stored on Sup20-03.  Sam to make final decision on manner of storage of equipment.