Date 08-12-2019
Pass-On Subject A-shift
Pass-On Information Apparatus checks and SCBA checks completed
Hazmat Training

We discovered the onboard air fittings on Hazmat 20 are 3/8. All of our pneumatic equipment has 1/4 fittings, the plan is to change some things over to 1/4", however in the meantime we made an adapter. It's in the top draw of the tool box, officer side first roll up compartment.

Station choirs complete

FIRE CALL:

I-70 WB @32mm gasoline leak
Patched the tank and mitigated the spill

Hazmat 20 Fueled

Hazmat issues:
1. There's a bad sensor causing the red compartment open light to flash intermittently.
2. Rear scene lights do not work


This Thursday Matt and I will be working on the zodiac and Chesapeake boats. Gluing and patching, in addition to gluing on the new banners on the Chesapeake