Re: Apparatus Maintenance Request - Austin McCoy

 
  Apparatus Maintenance Request
 
Name Austin McCoy
Date 08-31-2019
Email amccoy@washco-md.net
Unit HM20
Unit Status In Service
Description of Issue The inverter was not working. Also noticed the auto charger was not charging either. I reset the outlet that is on the inverter and the inverter and auto charger began to work.

The auto charger has stopped working. It displays the voltage, however does not indicate if its charging, charged, etc.
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 08-30-2019
Pass-On Subject C-shift Pass On
Pass-On Information -Pig-tail for 20-01 found damaged beyond use.  Part picked up from Lowes and new pit-tail built.

-RS20 weekly completed with no new issues found.

-RS20 washed and fueled.
Name Otter
Email enginedriver71@comcast.net
 
     
 
 

Wednesday, August 28, 2019

Pass-On

 
 
  Pass-On
 
Date 08-27-2019
Pass-On Subject D-Shift: Tuesday August 28th
Pass-On Information -BT20 & BS20 checked
-Walmart for supplies
-Ran HDMI cable and mounted two tv's for the cad system.
-Off loaded 250 gallons of clean fuel into the yard tank.
-Washed and fueled HM20
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Friday, August 23, 2019

EDIT: Pass-On

 
 
  Pass-On
 
Date 08-23-2019
Pass-On Subject D-Shift: August 23rd 2019
Pass-On Information -RS20 checked. Unable to calibrate meters due to out of gas. Spare meter placed on RS20-01 since it was in date.
-PPV fan was placed back on RS20 (unknown why it was removed)
-Staff meeting
-Bay floors were cleaned
-RS20-01 picked up from EVS. Back in service
-RS20-01 & RS20 fueled and rinsed off
-4 new scba masks are ready to be distributed. They're on the work bench. Help yourself. Ran out of new straps for the others, will order more.
-Found the rear perimeter lights on RS20-01 were bent up and damaged. Believe this happened when D&D towed it to EVS. Think maybe they drug going up the hill out of the station.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 08-23-2019
Pass-On Subject D-Shift: August 23rd 2019
Pass-On Information -RS20 checked. Unable to calibrate meters due to out of gas. Spare meter placed on RS20-01 since it was in date.
-Staff meeting
-Bay floors were cleaned
-RS20-01 picked up from EVS. Back in service
-RS20-01 & RS20 fueled and rinsed off
-4 new scba masks are ready to be distributed. They're on the work bench. Help yourself. Ran out of new straps for the others, will order more.
-Found the rear perimeter lights on RS20-01 were bent up and damaged. Believe this happened when D&D towed it to EVS. Think maybe they drug going up the hill out of the station.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Thursday, August 22, 2019

Pass-On

 
 
  Pass-On
 
Date 08-22-2019
Pass-On Subject C-Shift 8/22/19
Pass-On Information -UT20 weekly completed with no new issues found.

-Per S. Anderson, grounding and bonding cables were moved to driver's side top front coffin compartment.

-Per S. Anderson, 2 bags of vermiculite added to officer's side front coffin compartment.

-Per S. Anderson, Chesapeake returned to Phoenix.

-Rope training completed.

-F-100 & KI paper added to sampling box on HM20.  Further training coming.

-Station air filters changed.

-Inc#19505, 6 bags absorbent and 2 bags oil dry used.  All replaced.  No more absorbent in station, need a skid from Phoenix.  

-After returning from Inc#19505, the officer's side rear coffin compartment light was found to have melted to a bag of absorbent.  Light was removed for replacement.  C-shift handling.  In future don't pack anything under the light.

-Units fueled:  HM20, BS20, UT20, Mower20
Name Otter
Email enginedriver71@comcast.net
 
     
 
 

Monday, August 19, 2019

Pass-On

 
 
  Pass-On
 
Date 08-19-2019
Pass-On Subject D-Shift: August 19th 2019
Pass-On Information -Gator & Collapse checked
-D&D towing towed RS20-01 to EVS
-RS20 fueled
-Masks & tools cleaned after fire
-UT20 washed
-Minifridge was added to the Hazmat
-Walmart for supplies
-HM20 filled with fuel & DEF
-Rope training
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Sunday, August 18, 2019

Pass-On

 
 
  Pass-On
 
Date 08-18-2019
Pass-On Subject C-shift 8/18
Pass-On Information -All batteries on HM20 were dead.  All charged and placed back with radio but not in radio pouches.  Charger that was previously on old HM20 does not seem to be charging batteries correctly.  Continuously shows a fault.

-CO2 extinguisher mounted on HM20 in drivers side pump-off compartment.  Cleanup worked need on mounting and will be done next C-shift 8/22.

-Both meters on RS20 found dead and out of calibration.  Calibrated, charged and back on unit.

-Shower bleached and scrubbed.

-UT20 looks to be leaking oil.  Ran fine on Inc#19119 but it needs to be looked at.  UT20 fueled.
Name Otter
Email EngineDriver71@comcast.net
 
     
 
 

Saturday, August 17, 2019

Re: Small Equipment/SCBA Maintenance Request

 
  Small Equipment/SCBA Maintenance Request
 
Date 08-17-2019
Name Benjamin Hoopengardner
Email bhoopengardner@washco-md.net
Unit Equipment is Assigned to RS20
Equipment Status Out of Service
Equipment Replaced With Mask from back
Description of Issue Officer airpack mask has cracks in it. Placed mask on work bench.
 
     
 
 

Thursday, August 15, 2019

EDIT: Pass-On

 
 
  Pass-On
 
Date 08-15-2019
Pass-On Subject D shift- Thursday August 15th 2019
Pass-On Information -Utility checked
-Active assailant training
-Hazmat training
-Grass mowed...
-Armor and helmets placed in two red bags and placed on the hazmat. In the officer side rear compartment with the EMS stuff.
-McCoy to CO12 for Knox Box stuff
-McCoy to Health @ Work for random drug test
-UT20 loosing oil pressure while enroute to a call
-A29 picked up and brought back to the station for drill tomorrow.
-RS20-01 OOS. While driving the temperature spiked and blew coolant. Unknown if a line blew.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Re: Apparatus Maintenance Request - Austin McCoy

 
  Apparatus Maintenance Request
 
Name Austin McCoy
Date 08-15-2019
Email amccoy@washco-md.net
Unit RS201
Unit Status Out of Service
Description of Issue While driving, could smell coolant burning and then the temperature gauge spiked high. Made it back to the station, coolant was steadily dripping from it.
 
     
 
 

Re: Apparatus Maintenance Request - Austin McCoy

 
  Apparatus Maintenance Request
 
Name Austin McCoy
Date 08-15-2019
Email amccoy@washco-md.net
Unit UT20
Unit Status In Service
Description of Issue While enroute to a call, numerous times the "Low oil pressure" alert came on. The pressure would drop to 0. Driving back to the station, while on the accelerator, the pressure was around 30. When you let off the accelerator the pressure would drop to just above 0
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 08-15-2019
Pass-On Subject D shift- Thursday August 15th 2019
Pass-On Information -Utility checked
-Active assailant training
-Hazmat training
-Grass mowed...
-McCoy to CO12 for Knox Box stuff
-McCoy to Health @ Work for random drug test
-UT20 loosing oil pressure while enroute to a call
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 08-14-2019
Pass-On Subject Pass-On 8-14
Pass-On Information -Equipment for contaminated fuel has been put on HM20.  2 barrels are in each coffin compartment on the drivers side under the absorbent.  The 1 dirty pump, both air lines, all the fuel hoses, and both filters are in the rear compartment.  2nd stinger will be mounted shorty.

-1 TIC has been back to RS20.  Each squad now has one.

-5 gallon pail of acid that has been in the bay for the past 2 months was neutralized and disposed of.  

-Broke meter from HM20 repaired and back on unit.  Spare back in office.
Name Otter
Email enginedriver71@comcast.net
 
     
 
 

Tuesday, August 13, 2019

Pass-On

 
 
  Pass-On
 
Date 08-12-2019
Pass-On Subject A-shift
Pass-On Information Apparatus checks and SCBA checks completed
Hazmat Training

We discovered the onboard air fittings on Hazmat 20 are 3/8. All of our pneumatic equipment has 1/4 fittings, the plan is to change some things over to 1/4", however in the meantime we made an adapter. It's in the top draw of the tool box, officer side first roll up compartment.

Station choirs complete

FIRE CALL:

I-70 WB @32mm gasoline leak
Patched the tank and mitigated the spill

Hazmat 20 Fueled

Hazmat issues:
1. There's a bad sensor causing the red compartment open light to flash intermittently.
2. Rear scene lights do not work


This Thursday Matt and I will be working on the zodiac and Chesapeake boats. Gluing and patching, in addition to gluing on the new banners on the Chesapeake


Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Monday, August 12, 2019

Pass-On

 
 
  Pass-On
 
Date 08-11-2019
Pass-On Subject D Shift- Sunday August 11th 2019
Pass-On Information •RS20-01 checked & Fueled
•Added two new foldable benches to the hazmat. They've been placed in the Decon compartment as requested
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Thursday, August 8, 2019

Pass-On

 
 
  Pass-On
 
Date 08-07-2019
Pass-On Subject D-Shift Wednesday August 8th 2019
Pass-On Information -Finished transferring stuff from the old hazmat to the new
-Hazmat drivers training
-RS20-01 fueled
-Added some hand tools and power tool accessories on the hazmat
-Old Hazmat was taken to the warehouse
Name Austin
Email amccoy@washco-md.net
 
     
 
 

Tuesday, August 6, 2019

Re: Apparatus Maintenance Request - Mr Otter

 
  Apparatus Maintenance Request
 
Name Mr Otter
Date 08-06-2019
Email enginedriver71@comcast.net
Unit BT20
Unit Status Out of Service
Description of Issue Boat 20A OOS.  Its flat and won't float...and that's bad.
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 08-06-2019
Pass-On Subject 8-6-19 Pass On
Pass-On Information -Boat 20A bow section found deflated during morning checks.  Inflated and left next to Boat 20 for observation.  By lunch it was showing signs of deflating and by evening it is clearly leaking.  Removed from service.  K. Hose to be notified in AM (8/7).

-New HM20 placed in service.  Equipment moved over and made ready.  Review equipment placement.  Old HM20 placed in far bay, RS20-01 in old HM20 bay.  Once all equipment and supplies are removed it can be moved to Phoenix. Door openers switched between old HM20 and RS20-01.

-Pig-tail for Sup20-03 moved to RS20-01.  We do not have the proper female connection to make new one.  Will need to be picked up.

-Contaminated fuel pump off equipment is on loading dock by rear of Sup20-03.  Discussion was to have that equipment stored on Sup20-03.  Sam to make final decision on manner of storage of equipment.
Name Otter
Email enginedriver71@comcast.net
 
     
 
 

Sunday, August 4, 2019

Pass-On

 
 
  Pass-On
 
Date 08-03-2019
Pass-On Subject D-Shift Saturday August 3rd 2019
Pass-On Information •Picked up another poly barrel
•HM20 checked
Name Austin McCoy
Email Amccoy@washco-md.net
 
     
 
 

Saturday, August 3, 2019

Pass-On

 
 
  Pass-On
 
Date 08-02-2019
Pass-On Subject C-Shift
Pass-On Information -Two level A suites airing out, one needs marked to double glove due to liner being cut out.
-Support 20-05 radio id changed to boat support 20
-HM-20 mounting continued
-RS 20-01 not charging all the way
-All cylinders were filled
-Mister fans taken back to rehab 255
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Friday, August 2, 2019

Pass-On

 
 
  Pass-On
 
Date 08-01-2019
Pass-On Subject B-Shift 8-1
Pass-On Information -Level A entry made on Inc#17728 for reported chlorine leak. No evidence of leak found.  Suits airing out behind HM20.  C-Shift will handle placing back in service on 8/2.

-3 poly barrels for contaminated diesel dropped off.  

-Equipment mounting on HM20 started.
Name Otter
Email enginedriver71@comcast.net
 
     
 
 

Thursday, August 1, 2019

Pass-On

 
 
  Pass-On
 
Date 07-29-2019
Pass-On Subject 7/29/19 Pass-On
Pass-On Information -Used 1 barrel for contaminated fuel pump off.  Left on scene for tow/recovery company.  MDE notified and aware.

-Both diesel pumps stripped and cleaned after pump-off.

-Macro filter stripped down and cleaned, micro filter replaced.
Name Otter
Email enginedriver71@comcast.net