Thursday, July 16, 2020

Pass-On

 
 
  Pass-On
 
Date 07-16-2020
Pass-On Subject B-Shift
Pass-On Information BT-20 taken to DIB.
Chesapeake moved from its trailer to the sled trailer.
Inventoried water rescue equipment.
Name Benjamin E Hoopengardner
Email bhoopengardner@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 07-15-2020
Pass-On Subject A crew
Pass-On Information Hose AO, McCoy EO, Shealy FF

Equipment and SCBA checks

Station chores complete

Boat 20 floor was deflated.
    - found a couple holes under the transom
    - transom was broken and exposed
    - placed OOS
    - boot and studs transferred to BT-20 C
    - removed motor in prep for taking it to DIB
    - equipment relocated to BT-20 C
    - bag of victim life vests placed in the back of
    BS
    - taking Boat 20 to DIB on Thursday morning

BT 20 A filled with air and gas
    - spare gas cell for BT-20A in the back of
    BS

Installed a battery tender on BT-20C

Docking Station fixed
    - all meters have been calibrated.

Weekly on UT 203 complete

Tank for station gas grill filled

New lettering painted on BT-20C

No calls

Shift Complete

   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Wednesday, July 15, 2020

Pass-On

 
 
  Pass-On
 
Date 07-14-2020
Pass-On Subject Hamrick/Fraley
Pass-On Information -Unit checks-found boat 20's floor flat

-203 electrical issues fixed

- confined space equipment loaded onto 203

-trash pump repaired and placed back onto the wall ledge

-Absorbent skid delivered

-Had to put air in the boat at 730 yesterday evening.

-IT did not make it here today, docking station still down.
Name Fraley/Hamrick
Email cfraley@washco-md.net
 
     
 
 

Monday, July 13, 2020

Pass-On

 
 
  Pass-On
 
Date 07-12-2020
Pass-On Subject A-Shift, Sunday July 12th 2020
Pass-On Information -RS20-01 checked

-Polly boot from the Chesapeake was removed and placed on Boat 20

-House chores

-BS20 washed & waxed

-BS20 fueled

-RS20-01 fueled

-BT20 fueled


INCIDENTS:

-Inaccessible-Stagged

-Water rescue #1- Cancelled

-Water rescue #2- Launched boat 20 and went up stream to retrieve the patient. Patient loaded onto the boat and brought back down to Synders Landing  
Name McCoy/Shealy/Hose
Email amccoy
 
     
 
 

Sunday, July 12, 2020

Pass-On

 
 
  Pass-On
 
Date 07-11-2020
Pass-On Subject 7-10 thru 7-11 Pass On
Pass-On Information C-Space equipment used for class.  Cleaned, inspected, tagged, and ready for use.

BT20 poly boot found damaged from rock strike.  Recommend we swap the boot from the Chessie till we get a replacement.  Also recommend we inspect the motor after each use to find damage early.

RS20 weekly (7-10) and HM20 weekly (7-11) completed.  Meters need cal.  1 RadEye battery was completely dead. Does not look like it was charged.

LCD 3.3 meter placed on HM20.  Both LCD 3.3 and Dahlgren training to take place the 20th-22nd.
Name Otter
Email dolson@washco-md.net
 
     
 
 

Thursday, July 9, 2020

EDIT: Pass-On

 
 
  Pass-On
 
Date 07-08-2020
Pass-On Subject D-Shift, Wednesday July 8th 2020
Pass-On Information -U203 wouldn't start. EVS called

-Bathrooms cleaned

-IT fixed the internet. Meter docking station still not working. Boyd is working on that.

-HM20 washed, waxed and cab cleaned

-EVS came to look at U203. Found a lot of lead build up on some of the terminals on the batteries. Cleaned those off and started just fine multiple times.

-To DES for Drager scba demo

-RS20-01 fueled


INCIDENTS

-Veh into building-Cancelled

-House fire- #JobTown
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 07-08-2020
Pass-On Subject D-Shift, Wednesday July 8th 2020
Pass-On Information -U203 wouldn't start. EVS called

-Bathrooms cleaned

-IT fixed the internet. Meter docking station still not working. Boyd is working on that.

-HM20 washed, waxed and cab cleaned

-To DES for Drager scba demo

-RS20-01 fueled


INCIDENTS

-Veh into building-Cancelled

-House fire- #JobTown
Name McCoy/Shealy
Email amccoy@washco-md.net