| |  | Pass-On |
| | | Date | 07-11-2020 | | Pass-On Subject | 7-10 thru 7-11 Pass On | | Pass-On Information | C-Space equipment used for class. Cleaned, inspected, tagged, and ready for use. BT20 poly boot found damaged from rock strike. Recommend we swap the boot from the Chessie till we get a replacement. Also recommend we inspect the motor after each use to find damage early. RS20 weekly (7-10) and HM20 weekly (7-11) completed. Meters need cal. 1 RadEye battery was completely dead. Does not look like it was charged. LCD 3.3 meter placed on HM20. Both LCD 3.3 and Dahlgren training to take place the 20th-22nd. | | Name | Otter | | Email | dolson@washco-md.net |
| | | | | |
|
No comments:
Post a Comment