Thursday, May 21, 2020

Pass-On

 
 
  Pass-On
 
Date 05-20-2020
Pass-On Subject C-Shift
Pass-On Information 203 checked, still will occasionally shut off after starting. Siren O.O.S.

Squad 20 was expected back on 5/20 but was not delivered, confined space equipment is on bay floor

Water rescue skills day lesson plan was created and email sent out.

Both rigging and attendant bags were sealed. 540's were pulled and a double pulley was added to move towards mirrored 5:1 lines.

Hazmat training completed

Went to jobtown twice, hand tools sprayed off.  
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Monday, May 18, 2020

Pass-On

 
 
  Pass-On
 
Date 05-18-2020
Pass-On Subject D-Shift, Sunday May 17th 2020
Pass-On Information -RS20-01 checked

-Apparatus checks

-Scheduling worked on

-Purchased two window A/C units and installed them in the bunkrooms

-Purchased 3 sheets of 3/4 plywood and re-stocked the collapse

-RS20-01 fueled
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Sunday, May 17, 2020

Pass-On

 
 
  Pass-On
 
Date 05-16-2020
Pass-On Subject C-shift Pass On
Pass-On Information -HM20 weekly completed.  3 SCBA had dead HUD batteries and were replaced.  Batteries removed from voice amps and placed in battery box to avoid corrosion.  Batteries removed from Draeger CMS unit and left in box.  All Draeger tubes consolidated into 1 case.  Empty meter case removed as well.

-Level B suit inventory changed.  Encapsulating B suits removed.  6 flash protection suits added.  4XL suits reduced to a total of 3, 4 XL Tychem CPF3 suits added.  Bags for all suits clearly labeled.

-Boats were checked in preparation for the potential TS.  Please run the motor each morning.  Its been slow to start.
Name Olson / Fraley
Email dolson@washco-md.net
 
     
 
 

Saturday, May 16, 2020

Pass-On

 
 
  Pass-On
 
Date 05-15-2020
Pass-On Subject B-crew
Pass-On Information Hose (trade for DJ) and Hoop

    Apparatus checks
   
    Checked RS-20

    Blew out bays

    Washed RS-20 and BS-20

    Assisted HCC with unloading hospital beds

    Put the water fitting on the 2-stroke and ran
         Boat motor for 20min.
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Friday, May 15, 2020

Pass-On

 
 
  Pass-On
 
Date 05-14-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poffinberger
   
    Apparatus and SCBA checks
        No face pieces on either RS. Can we put
        some spares back on in case someone
        forgets or damages theirs on a call?

    No weekly checks with UT-20 OOS
 
    Placed the concrete chainsaw back in service.
         I cleaned the spark plug and adjusted the
         gap spacing. I also adjusted the throttle
         (idle) speed. After working on it we allowed
         It to run for about 30 mins. Fueled it and
         placed it back on RS-20.

    Switched the cast Aluminum boot on the 2-
         stroke 40 with the rock proof off the EFI 40.
         Put the garden hose fitting in and did a run
         test on the motor.
         Remember to prime the fuel line with the
         bulb, then press in on the key for a few
         seconds to prime the carb. Doing both of
         these steps first the motor fires off no
         problem.

    if you guys are going to do more than turn it on
    and immediately shut it back off, the hose
    fitting has to be installed and cold water
    running to let it idle. The hose fitting doesn't
    supply enough water to allow you to throttle up
    but you can let it idle and move some gas
    Through the lines.

    Grass mowed
   
    Tire workout

    Station cleaned

    Two hazmat calls, one we assisted the owner in
    pumping fuel into a spare fuel cell.

    One PUI decon

Shift complete


 
   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Thursday, May 14, 2020

Pass-On

 
 
  Pass-On
 
Date 05-13-2020
Pass-On Subject D-Shift, Wednesday May 13th 2020
Pass-On Information •U203 checked-Siren not working. Found a loose wire. C shift will work on it on Saturday

•0900-1200 rope training at the training center

•McCoy worked on scheduling for a couple hours

•1 box alarm (no fire)

•1 decon. Exchanged 1 Medium raincoat. The dirty one was deconed and is hanging up out back to dry and air out
Name McCoy/Shealy
Email amccoy
 
     
 
 

Wednesday, May 13, 2020

Pass-On

 
 
  Pass-On
 
Date 05-12-2020
Pass-On Subject C-Shift
Pass-On Information -SCBA's were cleaned after finding debris in them from Prospect Street. Found front SCBA switched to the back without being cleaned.

-Lumber removed from 203 and placed back by the rack. Paslode gun was found off the trailer, dirty, case was empty of supplies, and with a dead battery. Items in the trailer were not put back from the fire on Prospect. This was also missed on the weekly checks with no notes made.

-Radio mant. was here and identifiers were changed. Two assigned to the Boat Support and Hazmat, and remaining four are to float.

-Looking into getting a connection for propane tanks when flaring them.

-Decon tent taken down and placed by gasoline cabinet in case needed.

-Two SCBA facepieces found in units. If you are missing yours, see Austin.
Name Fraley/Olson
Email cfraley@washco-md.net