Monday, April 20, 2020

Pass-On

 
 
  Pass-On
 
Date 04-19-2020
Pass-On Subject D-Shift, Sunday April 19th 2020
Pass-On Information -Apparatus checks

-RS20-01 checked

-Schedule worked on

-Station air filters bought at Lowe's

-Off loaded 225-250 gallons of fuel. Yard tank is FULL and the tote in the shed is half full.

-HM20 fueled
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Saturday, April 18, 2020

Pass-On

 
 
  Pass-On
 
Date 04-18-2020
Pass-On Subject C-Shift
Pass-On Information -HM-All batteries charged

-Meters Labeled with larger labels that         include "A" and "B" markings to avoid confusion going down range

-Lumber consolidated on one shelf

-Water Equipment moved to rack/rear bay floor cleaned up

-Skid Steer tires were inspected, two holes with active leaks were found. Holes were plugged and tires filled.
Trailer tires were found low and filled.
Skid Steer was fueled and taken to the warehouse

-Couch coverings washed

-Boat Motor turned sideways after finding it wedged against the rear door.

Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 04-17-2020
Pass-On Subject B-Shift, Friday April 17th 2020
Pass-On Information -McCoy on at 0400, Hose to MMC due to illness.  

-Hoop on at 0730

-Skid 20 brought to the fire to assist. It was utilized and ended up with a bolt and some nails in tires.

-BS20 washed

-RS20-01, BS20, Skid20 & U203 fueled

-K-12 cleaned from the fire.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Friday, April 17, 2020

Pass-On

 
 
  Pass-On
 
Date 04-16-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poffinberger ON

    SCBA and Equipment checks
    Apparatus checks
    Yard work complete
    Cylinders filled
    Rope training
    Moved beds from HCC to MMC

1 PUI decon of 752
Commercial building fire, south end shopping ctr
    Cylinders filled
Water rescue, canceled in route
2 alarm commercial building fire on oak ridge
    Cylinders filled
    K-12 used on trench cutting roof.
   
MCcoy relieved Hose Early. 0530ish I was taken to the hospital for evaluation. All tests came back negative. Dr. thinks I have a GI bug.

Shift complete

   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Thursday, April 16, 2020

Pass-On

 
 
  Pass-On
 
Date 04-15-2020
Pass-On Subject D-Shift, Wednesday April 15th 2020
Pass-On Information -U203 checked

-Rope training

-MCC2 picked up and taken to county roads, then brought back to the warehouse

-RS20-01 fueled

-2 Decons
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Wednesday, April 15, 2020

Pass-On

 
 
  Pass-On
 
Date 04-14-2020
Pass-On Subject C-shift Pass On
Pass-On Information -Radio maintenance inventoried all portable radios.  More to come on this in the coming weeks.

-Older portable batteries are in the process of being checked for their longevity of use.  Potential to be phased out in the future.
-BS20 weekly completed.  Through reorg completed.

-1 adult, 1 pedi, and 1 infant BVM picked up.  Infant placed in RS20 EMS bag and others placed in cabinet.

-HazMat radios reconditioned.  2 chargers will be placed in HM20 for these to be charged.
Name Olson / Fraley
Email EngineDriver71@comcast.net
 
     
 
 

Monday, April 13, 2020

Pass-On

 
 
  Pass-On
 
Date 04-12-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON
 
     Sterilized and cleaned the station

     SCBA and Equipment checks
   
     Weekly on 201

     Quarterly waxing and polishing of HM-20

     1 PUI decon with aerosolized treatment. 692
           Face piece and regulator cleaned

     Body recovery assisting MSP.
           Gator 20 washed
           Stokes basket sanitized and left out to dry
           Fuel is good
           Removed a seal on blue attendant rigging
                 bag but didn't use any equipment.
                 Bag came of squad 20. Did not
                 replace seal.

    2 cylinders need filled, beside stairs off HM-20

Shift Complete



     
Name Keith Hose
Email Khose@washco-md.net