Tuesday, April 7, 2020

Pass-On

 
 
  Pass-On
 
Date 04-06-2020
Pass-On Subject c
Pass-On Information Gator and Collapse checked

Sheds organized (working progress)

Rear tail light replaced on 201

One decon performed 752


Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Saturday, April 4, 2020

Pass-On

 
 
  Pass-On
 
Date 04-03-2020
Pass-On Subject D-Shift, Friday April 3rd 2020
Pass-On Information -RS20 checked

-RS20-01 to the warehouse to tear down the tent and for general cleanup

-1 box alarm

-1 decon

-McCoy work on scheduling

-Shealy took U203 to pick up racks from the warehouse and took them to MMC

-Cleaned up the closet below the stairs

-RS20-01 fueled
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Friday, April 3, 2020

Pass-On

 
 
  Pass-On
 
Date 04-02-2020
Pass-On Subject C-Shift
Pass-On Information one decon performed

equipment moved around at mmc

grass cut

long and sort hitch are on 203

H2S gas came in

Safety Officer and Health Department Director inspected and reviewed our decon process and was impressed/satisfied

Please use incident type 451 and action taken 46 codes when completing decon firehouse reports
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Wednesday, April 1, 2020

Pass-On

 
 
  Pass-On
 
Date 03-31-2020
Pass-On Subject A crew
Pass-On Information Hose and Poff ON

    apparatus and SCBA checks

    cleaned and sanitized station
   
    Weekly Check on BT 20/20A, BS-20 completed
          Filled boat 20 with Air

    assisted Olsen in building gear racks to hang
          rain coats on behind 201.

    tested petrogen torch that had been worked on
          Two spare 02 Cylinders swapped out, one
                was totally empty and the other only
                had 500 psi that we burned in testing
                the torch and fittings. Swapped out
                at "ROBERTS OXYGEN"
          Torch did fine, no leaks in the fittings.

    1 PUI and two boomerangs.

    Fueled BS-20

Shift Completed
         
   
   


Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Tuesday, March 31, 2020

Pass-On

 
 
  Pass-On
 
Date 03-30-2020
Pass-On Subject D shift, Monday March 20th 2020
Pass-On Information -Gator and collapse checked

-Scheduling stuff

-House cleaning

-Picked up 90 rain coats

-Shawn Hartsock picked up 203 and took MCC2 and the old John boat trailer to highways


Name Austin McCoy
Email Amccoy@washco-md.net
 
     
 
 

Sunday, March 29, 2020

EDIT: Pass-On

 
 
  Pass-On
 
Date 03-28-2020
Pass-On Subject B-shift
Pass-On Information Hose (24 OT) and Hoop

    Decontaminated and cleaned station
    Apparatus and SCBA checks complete

    Hazmat 20 weekly check complete
          Calibrated meters
          HM-20 3 (5 gas) HCN sensor failed      
                replaced with spare 2
          Meters all zeroed and peaks cleared
          RID EYE battery charged
 
    HCN Cal gas is low, Morgan has been notified

    (3)  PUI decontaminations
          Face piece cleaned
          Used another 45 min cylinder off RS-201

    Finished cleaning and blowing out petrogen
          torch tip. It should be tested before going
          back in service. A lot of the ports were
          Clogged with slag.


Shift complete

         
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 03-28-2020
Pass-On Subject B-shift
Pass-On Information Hose (24 OT) and Hoop

    Decontaminated and cleaned station
    Apparatus and SCBA checks complete

    Hazmat 20 weekly check complete
          Calibrated meters
          HM-20 3 (5 gas) HCN sensor failed      
                replaced with spare 2
          Meters all zeroed and peaks cleared
          RID EYE battery charged
 
    HCN Cal gas is low, Morgan has been notified

    (2) PUI decontaminations
          Face piece cleaned
          Used another 45 min cylinder off RS-201

    Finished cleaning and blowing out petrogen
          torch tip. It should be tested before going
          back in service. A lot of the ports were
          Clogged with slag.


Shift complete

         
Name Keith Hose
Email Khose@washco-md.net