Tuesday, November 5, 2019

Pass-On

 
 
  Pass-On
 
Date 11-05-2019
Pass-On Subject B shift pass on
Pass-On Information BS20, Boat 20 checked.

RS 20-01, HM20, U203/Skid20 To 19914 Leitersburg Pike for the building fire.

Remaining booms on back rack used to replaced the used booms.

Tools and air packs on RS20-01 were cleaned and placed back on the unit.

5 gas meter on RS20-01 was calibrated/ charged and placed back on RS 20-01.

RS20-01 Fueled.

Skid 20 and attachments were power washed and returned to the ware house.

trash taken out, station swept.




Name Clay Shealy
Email cshealy@washco-md.net
 
     
 
 

Monday, November 4, 2019

Pass-On

 
 
  Pass-On
 
Date 11-03-2019
Pass-On Subject D-Shift, Sunday November 2nd 2019
Pass-On Information -Pulled con. space equipment off and preformed a function test. Test the com system and tested the coms on all lines.
-Air cart on RS20 is OOS. It will be fixed on C shift. Air cart from Collapse 20 placed on RS20
-RS20-01 checked, light tower still OOS. Meters calibrated and charged
-Some equipment on RS20-01 driver side first compartment was rearranged. Some equipment from the top shelf and the middle shelf was swapped. This is to make the EMS equipment more accessible.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Sunday, November 3, 2019

Pass-On

 
 
  Pass-On
 
Date 11-02-2019
Pass-On Subject C-Shift
Pass-On Information -RS20-01 fueled
-Apparatus checks
-HM20 checked. Meters calibrated and charged. Rid eye charged
-Continued station clean up
-Loaded U203 full of stuff and took the stuff to the warehouse.
-Floors swept and mopped, bay floor blown out, classroom cleaned
-Red boat placed on top of the other boat.
-Removed tote and drum from U203. That is now in the shed.
-Grain bin rescue device placed on U203
-Skid of absorbent placed on U203 for the winter season.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Friday, November 1, 2019

Pass-On

 
 
  Pass-On
 
Date 10-31-2019
Pass-On Subject A SHIFT
Pass-On Information Hose and Poffinberger ON

Equipment and SCBAs checked

Ran all the chainsaws

Patched the transom on BT 20A
    Front left cross over line is leaking. If your    
    using it, simple break the connection in the
    middle of the crossover line and it will hold air
    without problems. If it remains connected it will
    lose air in the front left bow tube over about 2
    hours of time. At this point we are searching
    for a solution but the boat is in service.

Cleaned the Fridge out

Station chores completed

Two cylinders (out of surplus packs from utility 20)
Need filled

Grass was too wet to cut, we will take care of it our next shift.

400 blk Oak ridge Dr.  Fluid spill
2 Box                         House Fire

Shift complete


Name Keith Hose
Email Khose@washco-md.net
Upload Photo F0E4A15C-5A71-4819-824E-FEBA279766BE.jpeg
 
     
 
 

Thursday, October 31, 2019

Pass-On

 
 
  Pass-On
 
Date 10-30-2019
Pass-On Subject D-Shift: Wednesday October 30th 2019
Pass-On Information -U203 checked
-Apparatus checks
-0900-1330 tested all level A suits.
Total suits tested:17
Total suits passed: 12
Total suits failed: 5
-On the hazmat we now have the follow level A suits.  2-XL, 6-XXL and 4-XXXL
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Wednesday, October 30, 2019

Pass-On

 
 
  Pass-On
 
Date 10-29-2019
Pass-On Subject C-shift Pass On 10/29/19
Pass-On Information -All meters on HM20 calibrated after hazmat drill.

-Air unit filled all cylinders used during hazmat drill.

-6 A-suits airing out in training room.  S. Anderson advised he will be testing and placing back on HM20.

-4 MX6 meters re-calibrated again after TT hazmat fire on I81.

-2 pallets of speedy dry delivered and in U20 bay.

-BT20 adn BS20 checked with no new issues found.

-I could text Austin all this and speed up the process because he's the only other one that reads this.
Name Otter
Email EngineDriver71@comcast.net
Upload Photo 1.png
 
     
 
 

Sunday, October 27, 2019

Pass-On

 
 
  Pass-On
 
Date 10-26-2019
Pass-On Subject D-Shift:  October 26th 2019
Pass-On Information -Hazmat checked
-Inverter was not working again. Believe the power strip is bad. Used another power strip and now it's working fine.
-IT training
Name Austin McCoy
Email amccoy@washco-md.net