Wednesday, July 15, 2020

Pass-On

 
 
  Pass-On
 
Date 07-14-2020
Pass-On Subject Hamrick/Fraley
Pass-On Information -Unit checks-found boat 20's floor flat

-203 electrical issues fixed

- confined space equipment loaded onto 203

-trash pump repaired and placed back onto the wall ledge

-Absorbent skid delivered

-Had to put air in the boat at 730 yesterday evening.

-IT did not make it here today, docking station still down.
Name Fraley/Hamrick
Email cfraley@washco-md.net
 
     
 
 

Monday, July 13, 2020

Pass-On

 
 
  Pass-On
 
Date 07-12-2020
Pass-On Subject A-Shift, Sunday July 12th 2020
Pass-On Information -RS20-01 checked

-Polly boot from the Chesapeake was removed and placed on Boat 20

-House chores

-BS20 washed & waxed

-BS20 fueled

-RS20-01 fueled

-BT20 fueled


INCIDENTS:

-Inaccessible-Stagged

-Water rescue #1- Cancelled

-Water rescue #2- Launched boat 20 and went up stream to retrieve the patient. Patient loaded onto the boat and brought back down to Synders Landing  
Name McCoy/Shealy/Hose
Email amccoy
 
     
 
 

Sunday, July 12, 2020

Pass-On

 
 
  Pass-On
 
Date 07-11-2020
Pass-On Subject 7-10 thru 7-11 Pass On
Pass-On Information C-Space equipment used for class.  Cleaned, inspected, tagged, and ready for use.

BT20 poly boot found damaged from rock strike.  Recommend we swap the boot from the Chessie till we get a replacement.  Also recommend we inspect the motor after each use to find damage early.

RS20 weekly (7-10) and HM20 weekly (7-11) completed.  Meters need cal.  1 RadEye battery was completely dead. Does not look like it was charged.

LCD 3.3 meter placed on HM20.  Both LCD 3.3 and Dahlgren training to take place the 20th-22nd.
Name Otter
Email dolson@washco-md.net
 
     
 
 

Thursday, July 9, 2020

EDIT: Pass-On

 
 
  Pass-On
 
Date 07-08-2020
Pass-On Subject D-Shift, Wednesday July 8th 2020
Pass-On Information -U203 wouldn't start. EVS called

-Bathrooms cleaned

-IT fixed the internet. Meter docking station still not working. Boyd is working on that.

-HM20 washed, waxed and cab cleaned

-EVS came to look at U203. Found a lot of lead build up on some of the terminals on the batteries. Cleaned those off and started just fine multiple times.

-To DES for Drager scba demo

-RS20-01 fueled


INCIDENTS

-Veh into building-Cancelled

-House fire- #JobTown
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 07-08-2020
Pass-On Subject D-Shift, Wednesday July 8th 2020
Pass-On Information -U203 wouldn't start. EVS called

-Bathrooms cleaned

-IT fixed the internet. Meter docking station still not working. Boyd is working on that.

-HM20 washed, waxed and cab cleaned

-To DES for Drager scba demo

-RS20-01 fueled


INCIDENTS

-Veh into building-Cancelled

-House fire- #JobTown
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Tuesday, July 7, 2020

Pass-On

 
 
  Pass-On
 
Date 07-06-2020
Pass-On Subject B-Shift, Monday July 6th 2020
Pass-On Information •Gator and collapse checked

•Apparatus checks

•Hose took the K12 that was OOS off of RS20 to Eby's for repair

•Officer window on RS20 off the track and wouldn't go up or down. That was repaired.

•IT came out to look at the internet. Still isn't working

•Hotspot from RS20 is upstairs to run the CAD screen


Incidents:
Grill fire, cancelled
Name McCoy/Olson
Email amccoy@washco-md.net
 
     
 
 

Sunday, July 5, 2020

Pass-On

 
 
  Pass-On
 
Date 07-05-2020
Pass-On Subject D-Shift, Saturday July 4th 2020
Pass-On Information •HM20 checked

•Apparatus checks

•BS20 fueled and filled with DEF

•RS20-01 fueled


INCIDENTS:

•House Fire-BS

•Water rescue-canceled
Name McCoy/Shealy
Email Amccoy