Tuesday, May 26, 2020

Pass-On

 
 
  Pass-On
 
Date 05-25-2020
Pass-On Subject D-Shift, Monday May 25th 2020
Pass-On Information -Gator & Collapse checked. It appears there is new damage to the officer side front of the collapse trailer. Two holes and two spots lower near the stripe that was rubbed against.

-Apparatus checks
Name McCoy/Shealy
Email amccoy
 
     
 
 

Monday, May 25, 2020

Pass-On

 
 
  Pass-On
 
Date 05-24-2020
Pass-On Subject C-shift Pass On
Pass-On Information Classroom was setup for upcoming decon assignment.  Please leave it in the current configuration.  More info to come.

Responded to TT MVA with heavy entrapment.  100+ gallons of diesel offloaded after pt removed.  Offload pump was unable to move the diesel up the hill.  Portable pump placed in system as rely pump.  Needed to take filter adapters apart to build adapter on scene to get hoses to connect.  After return to station a filter adapters returned to normal and double male and double female adapters w/ shutoffs build and placed on unit.

Weekly completed on RS20-01.  
-Cutters Edge seems to be puking bar oil.  Cleaned and oil adjusted down to almost closed.  Keep an eye on it.  
-Please remember to refill the mix fuel cans when they get to ½.  Both were almost empty.  
-All cribbing is now on officers side over wheels (step chocks fell over and were blocking the extrication compartment door from opening).  
-Extra hand tools (shovels, trash hook, etc) moved to top shelf in drivers side over the wheel compartment.  
-Stokes with new bridle setup added.

Some equipment was moved around on HM20.  
-Trash cans and buckets from decon compartment up top w/ cones.  
-Wheeled cart added to decon compartment.  Handle can be attached with snap clip.
-Body bags removed from officers' side rear compartment.  
-Chem pump-off equipment and hydrocarbon fiber absorbent switched (keeps people away from the stay dry).  
-Chlorine kits and drum patching equipment switched (shelf damage from weight of Chlorine kits).
Name Otter / Fraley
Email dolson@washco-md.net
 
     
 
 

Friday, May 22, 2020

Pass-On

 
 
  Pass-On
 
Date 05-21-2020
Pass-On Subject D-Shift, Thursday May 21st 2020
Pass-On Information -Hazmat training 0800-1200

-McCoy worked on scheduling for a couple hours

-Shealy Mowed grass

-1 EMS call
Name McCoy/Shealy
Email amccoy
 
     
 
 

Thursday, May 21, 2020

Pass-On

 
 
  Pass-On
 
Date 05-20-2020
Pass-On Subject C-Shift
Pass-On Information 203 checked, still will occasionally shut off after starting. Siren O.O.S.

Squad 20 was expected back on 5/20 but was not delivered, confined space equipment is on bay floor

Water rescue skills day lesson plan was created and email sent out.

Both rigging and attendant bags were sealed. 540's were pulled and a double pulley was added to move towards mirrored 5:1 lines.

Hazmat training completed

Went to jobtown twice, hand tools sprayed off.  
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Monday, May 18, 2020

Pass-On

 
 
  Pass-On
 
Date 05-18-2020
Pass-On Subject D-Shift, Sunday May 17th 2020
Pass-On Information -RS20-01 checked

-Apparatus checks

-Scheduling worked on

-Purchased two window A/C units and installed them in the bunkrooms

-Purchased 3 sheets of 3/4 plywood and re-stocked the collapse

-RS20-01 fueled
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Sunday, May 17, 2020

Pass-On

 
 
  Pass-On
 
Date 05-16-2020
Pass-On Subject C-shift Pass On
Pass-On Information -HM20 weekly completed.  3 SCBA had dead HUD batteries and were replaced.  Batteries removed from voice amps and placed in battery box to avoid corrosion.  Batteries removed from Draeger CMS unit and left in box.  All Draeger tubes consolidated into 1 case.  Empty meter case removed as well.

-Level B suit inventory changed.  Encapsulating B suits removed.  6 flash protection suits added.  4XL suits reduced to a total of 3, 4 XL Tychem CPF3 suits added.  Bags for all suits clearly labeled.

-Boats were checked in preparation for the potential TS.  Please run the motor each morning.  Its been slow to start.
Name Olson / Fraley
Email dolson@washco-md.net
 
     
 
 

Saturday, May 16, 2020

Pass-On

 
 
  Pass-On
 
Date 05-15-2020
Pass-On Subject B-crew
Pass-On Information Hose (trade for DJ) and Hoop

    Apparatus checks
   
    Checked RS-20

    Blew out bays

    Washed RS-20 and BS-20

    Assisted HCC with unloading hospital beds

    Put the water fitting on the 2-stroke and ran
         Boat motor for 20min.
Name Keith Hose
Email Khose@washco-md.net