Date 05-04-2020
Pass-On Subject C-Shift
Pass-On Information -Gator and Collapse checked, plastic and nails were added to collapse from 201.

-Wood strip on gator trailer will be coming soon

-One decon rack moved outside to provide 360 degree spraying without flipping the jacket.

-Bleach solution in the sprayer should be emptied after each decon and rinsed with fresh water.

-Foam pads are accounted for and should be picked up this week.

Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Sunday, May 3, 2020

Pass-On

 
 
  Pass-On
 
Date 05-02-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poff ON

    Equipment and SCBA checks
    Weekly check in hazmat 20
         Calibrated 2 meters, a 4 and 5 gas. The
         other don't need calibrated for another 9
         days.

     BS-20 Fueled
         I bought more foam pads to dress out on
         top of. Please don't throw these away. Not
         what happened to the old ones but
         reguardless there is two new ones.

     SQUAD 20 fueled
     
     Grass mowed

     PT- tire workout

     
     
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Saturday, May 2, 2020

Pass-On

 
 
  Pass-On
 
Date 05-01-2020
Pass-On Subject D-Shift, Friday May 1st 2020
Pass-On Information •RS20 checked. Cutters Edge saw seems to be sluggish. If it keeps acting that way, it will go for service.

•E1 brought 2 rain coats, 1 was ripped so it was thrown away and the 2nd one was cleaned. M691 brought 2 rain coats, they were cleaned and issued 2 more.

•BT20 fueled, greased and filled with oil
Name McCoy/Shealy
Email Amccoy
 
     
 
 

Friday, May 1, 2020

Pass-On

 
 
  Pass-On
 
Date 04-30-2020
Pass-On Subject C-shift Pass On
Pass-On Information -Grass was not cut due to 3 inches of rain and the fact that Austin is a fucking douche!

-Boat motor was hesitant to start.  Recommend we start it each morning.

-Yellow RIT bag removed from RS20.

-Hurst Rabbit Tool moved from RS20 to RS20-01 and placed in 1st compartment on officers side top shelf.

-Rope equipment placed back on RS20-01.  Stokes basket still off unit.
Name Olson / Fraley
Email dolson@washco-md.net
 
     
 
 

Tuesday, April 28, 2020

Pass-On

 
 
  Pass-On
 
Date 04-27-2020
Pass-On Subject D-Shift, Monday April 27th 2020
Pass-On Information -Gator & Collapse checked

-Rope training

-RS20-01 to DES & Station 3

-RS20-01 fueled

Name McCoy/Shealy
Email amccoy
 
     
 
 

Monday, April 27, 2020

Pass-On

 
 
  Pass-On
 
Date 04-26-2020
Pass-On Subject C-Shift
Pass-On Information -All lumber moved from the squads to     replenish the collapse trailer

-Working to place cord on all edge protection to assist securing in place

-Working on unit specific check off sheets

-Rescue Squad 201 left 1/2 of light tower will not light up. Had to turn it on and off multiple times to raise and lower

-Changing our compliment of wood to 8 10ft posts and 8 8ft posts to better facilitate residential structures.

-4 premade t-post kits were constructed  
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Saturday, April 25, 2020

Pass-On

 
 
  Pass-On
 
Date 04-24-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON
 
    Apparatus and SCBA checks
    Station chores complete
    Stokes basket training complete
   
    (2)COVID-19 confirmed case
          (269 & 268)

    Vehicle into the building
          we constructed a 3 post shore inside and
          one T post on the front porch.
          materials used: (6) 4x4x 10' posts, (4)
          matched sets of wedges, (13) 1'x1'x3/4"
          gusset plates, (2) 6"x1'x3/4 gusset plates,
          (1) quick T shore pack, (2) 2x4x10', (1)
          can of passload gas, (5) racks of nails.
          WE NEED A CARD TO BUY REPLACEMENT
          MATERIALS.

Shift complete
               
Name Keith Hose
Email Khose@washco-md.net