Sunday, March 29, 2020

EDIT: Pass-On

 
 
  Pass-On
 
Date 03-28-2020
Pass-On Subject B-shift
Pass-On Information Hose (24 OT) and Hoop

    Decontaminated and cleaned station
    Apparatus and SCBA checks complete

    Hazmat 20 weekly check complete
          Calibrated meters
          HM-20 3 (5 gas) HCN sensor failed      
                replaced with spare 2
          Meters all zeroed and peaks cleared
          RID EYE battery charged
 
    HCN Cal gas is low, Morgan has been notified

    (3)  PUI decontaminations
          Face piece cleaned
          Used another 45 min cylinder off RS-201

    Finished cleaning and blowing out petrogen
          torch tip. It should be tested before going
          back in service. A lot of the ports were
          Clogged with slag.


Shift complete

         
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 03-28-2020
Pass-On Subject B-shift
Pass-On Information Hose (24 OT) and Hoop

    Decontaminated and cleaned station
    Apparatus and SCBA checks complete

    Hazmat 20 weekly check complete
          Calibrated meters
          HM-20 3 (5 gas) HCN sensor failed      
                replaced with spare 2
          Meters all zeroed and peaks cleared
          RID EYE battery charged
 
    HCN Cal gas is low, Morgan has been notified

    (2) PUI decontaminations
          Face piece cleaned
          Used another 45 min cylinder off RS-201

    Finished cleaning and blowing out petrogen
          torch tip. It should be tested before going
          back in service. A lot of the ports were
          Clogged with slag.


Shift complete

         
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Saturday, March 28, 2020

Pass-On

 
 
  Pass-On
 
Date 03-27-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poff

    Apparatus and SCBA checks
   
    Weekly check on SQUAD 20
        Gas meters calibrated
        Cascade cylinders are at 2000psi, we will be
             getting them filled with SCBA cylinders
        Cleaned tip on Oxy/acetylene torch
   
    Cleaned and filed ports on Petrogen Torch
   
    Antietam Tractor dropped off two tires for PT
    Purposes. Both have been deconed and placed
    outside by the fuel tank. Great workout!

   
    Station cleaned and Decontaminated
CALLS:
    (1) initial decon 26-8
    (2) PUI decons 79-1 and 75-9
          75-9 was deconed by 1811 while we were
          on other calls.
    (3) alerted for 3 house fires -all boomerangs-
    (4) SAR case at High Rock

Shift Complete

Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Friday, March 27, 2020

Pass-On

 
 
  Pass-On
 
Date 03-26-2020
Pass-On Subject D-Shift, Thursday March 26th 2020
Pass-On Information -Apparatus checks

-More cleaning supplies purchased

-Station chores and disinfection

-Grass mowed

-HM20 washed

-RS20, RS20-01 & HM20 fueled

-Deconed two ems transport units
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Thursday, March 26, 2020

Pass-On

 
 
  Pass-On
 
Date 03-25-2020
Pass-On Subject C-Shift
Pass-On Information -203 checked nothing significant
-Bad batch with the decon gun, a replacement is being sent
-Petrogen torch maint. still OOS
-Ambulance Decon log created, placed in the watch office
-Reviewed Decon procedures
-Decon was performed on 751,755,269
-Use Decon gun in the off position
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Tuesday, March 24, 2020

Pass-On

 
 
  Pass-On
 
Date 03-23-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poffinberger
   
    Apparatus and SCBA checks completed
    Weekly check on Collapse and Gator
    Decon Training
    Cleaned the entire station and Lysoled
         all touchable surfaces
    2-stoke motor maintenance complete

    Gas powered equipment exercised on SQ 20 &
         RS-201
   
    Poff tapped new treads in for the decon area
         work light and re-assembled.

    I'm going to be re-gluing gaskets into Drysuits
         next shift. I needed more glue and finally
         finished making all the new molds. If you
         see suits laying out please leave them alone
         they need time to dry in between coats.
         
    One call to CHestnut Grove Rd "boomerang"
   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Monday, March 23, 2020

Pass-On

 
 
  Pass-On
 
Date 03-22-2020
Pass-On Subject D-Shift, Sunday March 22nd 2020
Pass-On Information -RS20-01 checked

-Apparatus checks

-Scheduling stuff throughout the day

-Assisted getting the decon stuff set up for deconing ambulances

-Tag removed from fuel tank. It's be discussed and the decision was made to use the fuel up until the tank reaches a half tank. Keep a half tank as a reserve.
Name Austin McCoy