Saturday, March 28, 2020

Pass-On

 
 
  Pass-On
 
Date 03-27-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poff

    Apparatus and SCBA checks
   
    Weekly check on SQUAD 20
        Gas meters calibrated
        Cascade cylinders are at 2000psi, we will be
             getting them filled with SCBA cylinders
        Cleaned tip on Oxy/acetylene torch
   
    Cleaned and filed ports on Petrogen Torch
   
    Antietam Tractor dropped off two tires for PT
    Purposes. Both have been deconed and placed
    outside by the fuel tank. Great workout!

   
    Station cleaned and Decontaminated
CALLS:
    (1) initial decon 26-8
    (2) PUI decons 79-1 and 75-9
          75-9 was deconed by 1811 while we were
          on other calls.
    (3) alerted for 3 house fires -all boomerangs-
    (4) SAR case at High Rock

Shift Complete

Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

No comments:

Post a Comment