Saturday, March 28, 2020

Pass-On

 
 
  Pass-On
 
Date 03-27-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poff

    Apparatus and SCBA checks
   
    Weekly check on SQUAD 20
        Gas meters calibrated
        Cascade cylinders are at 2000psi, we will be
             getting them filled with SCBA cylinders
        Cleaned tip on Oxy/acetylene torch
   
    Cleaned and filed ports on Petrogen Torch
   
    Antietam Tractor dropped off two tires for PT
    Purposes. Both have been deconed and placed
    outside by the fuel tank. Great workout!

   
    Station cleaned and Decontaminated
CALLS:
    (1) initial decon 26-8
    (2) PUI decons 79-1 and 75-9
          75-9 was deconed by 1811 while we were
          on other calls.
    (3) alerted for 3 house fires -all boomerangs-
    (4) SAR case at High Rock

Shift Complete

Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Friday, March 27, 2020

Pass-On

 
 
  Pass-On
 
Date 03-26-2020
Pass-On Subject D-Shift, Thursday March 26th 2020
Pass-On Information -Apparatus checks

-More cleaning supplies purchased

-Station chores and disinfection

-Grass mowed

-HM20 washed

-RS20, RS20-01 & HM20 fueled

-Deconed two ems transport units
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Thursday, March 26, 2020

Pass-On

 
 
  Pass-On
 
Date 03-25-2020
Pass-On Subject C-Shift
Pass-On Information -203 checked nothing significant
-Bad batch with the decon gun, a replacement is being sent
-Petrogen torch maint. still OOS
-Ambulance Decon log created, placed in the watch office
-Reviewed Decon procedures
-Decon was performed on 751,755,269
-Use Decon gun in the off position
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Tuesday, March 24, 2020

Pass-On

 
 
  Pass-On
 
Date 03-23-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poffinberger
   
    Apparatus and SCBA checks completed
    Weekly check on Collapse and Gator
    Decon Training
    Cleaned the entire station and Lysoled
         all touchable surfaces
    2-stoke motor maintenance complete

    Gas powered equipment exercised on SQ 20 &
         RS-201
   
    Poff tapped new treads in for the decon area
         work light and re-assembled.

    I'm going to be re-gluing gaskets into Drysuits
         next shift. I needed more glue and finally
         finished making all the new molds. If you
         see suits laying out please leave them alone
         they need time to dry in between coats.
         
    One call to CHestnut Grove Rd "boomerang"
   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Monday, March 23, 2020

Pass-On

 
 
  Pass-On
 
Date 03-22-2020
Pass-On Subject D-Shift, Sunday March 22nd 2020
Pass-On Information -RS20-01 checked

-Apparatus checks

-Scheduling stuff throughout the day

-Assisted getting the decon stuff set up for deconing ambulances

-Tag removed from fuel tank. It's be discussed and the decision was made to use the fuel up until the tank reaches a half tank. Keep a half tank as a reserve.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Sunday, March 22, 2020

Pass-On

 
 
  Pass-On
 
Date 03-21-2020
Pass-On Subject C-shift Pass On
Pass-On Information -Hazmat weekly completed. RIIDEye batteries were completely dead.  Might need to leave on charge.  C-shift will investigate further.

-BS20, RS20-01, HM20, and Sup20-03 fueled.

-Started to clear and rearrange bays for pending decon assignment.

-Multiple Level-B suits, additional water and MREs picked up from warehouse.

-Decon supplies ordered.

-Used 4 bags of granular on Inc#6447.  2 bags given to Co16 for replacement.  Replaced on HM20.

-80gal diesel offloaded into yard take from Inc#6479.

-180gal diesel offloaded into yard take and tote in shed from Inc#6494.  Yard tank is full, all additional fuel to be placed in tote in shed.
Name Olson / Fraley
Email EngineDriver71@comcast.net
 
     
 
 

Friday, March 20, 2020

Pass-On

 
 
  Pass-On
 
Date 03-19-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poffenberger ON

    Apparatus checks
    Thoroughly cleaned and disinfected station
    Offloaded fuel into yard tank from D-crews
         pump off.
   
    Cleaned Macro filter
    Restocked Hazmat with sorbent

    COVID-19 Training

    Took a load of surplus to Phoenix, palletized it
    and placed in the cage.

    We were advised to Hoard fuel. Not to use the
    yard tank to fill apparatus.

    Took two office cubical panels to the airport

    Alerted for 2 building fires both were
         boomerangs

Shift complete

   
Name Keith Hose
Email Khose@washco-md.net