Monday, February 17, 2020

Pass-On

 
 
  Pass-On
 
Pass-On Subject 2-stroke Motor testing
Pass-On Information Hose and OcConnel

    Launch at River Bottom Park. Went up stream
    to dam 5 and back. Motor ran good. Shim
    placement is good.

    Top end of the throttle is tight, but manageable
   
    It runs 21 mph up stream at the current flow
    rate.
    EFI 4-stroke runs the same.

    I would like to leave this on as primary right
    right now, but it's something we should all
    discuss. It matters nothing to me.

    Only differences: manual trim, lighter, shifter
    placement and it jumps up on plane faster.

    Lift and lock the motor is your going to drag
    drag the motor past the roller.

    After use maintenance is complete, gas tank
    filled, oil filled, and greased.

Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 02-16-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poffinberger ON
     Apparatus and SCBA check
     RS-201 Checked
         -5gas meter needs calibrated. H2S gas is
           empty. Will calibrate when new gas comes
          in.
         -All gas equipment ran and refueled
         -4 gas meter calibrated and zeroed
     
     Mixed fuel added to the small 50:1 can, filled      
     several old true fuel cans. They are on top the
     flammable cabinet.
     
     Fueled RS-201
     
**  Woodbridge Drive    House Fire    RS-201
     canceled in route

**  General Lee Dr.       House Fire     RS-201
     canceled in route

Shift Complete
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Sunday, February 16, 2020

Pass-On

 
 
  Pass-On
 
Date 02-15-2020
Pass-On Subject D-Shift, Saturday February 16th 2020
Pass-On Information -HM20 checked, couple meters calibrated, however out of HCN gas.

-Apparatus checks

-House chores

-Started to remove some stuff from RS20-01. This was discussed to lighten up that unit and to remove stuff off of that unit that is no longer needed. See list beside pass on book of items removed so far.

-Some items on RS20-01 have been rearranged. Due to some heavy objects and not so strong shelves, we moved some items around for the time being to help keep any other damage from occurring.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Friday, February 14, 2020

Pass-On

 
 
  Pass-On
 
Date 02-14-2020
Pass-On Subject C-Shift
Pass-On Information -Attempted to pick up MAB from highways but they had already left for the weekend
-RS-20 cab lift is OOS
-Both squads fueled
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Thursday, February 13, 2020

Pass-On

 
 
  Pass-On
 
Date 02-13-2020
Pass-On Subject A Shift Pass-on
Pass-On Information •Apparatus checks completed.

•Rope training completed.

 Station chores done.

 Gator taken to john deere for service, Skid steer
 needed more work done and remained at john
 deere.

 BS20 fueled

 

 13706 Emily st. - vehicle fire next to a structure.

 

 



Name Clay Shealy
Email cshealy@washco-md.net
 
     
 
 

Wednesday, February 12, 2020

Pass-On

 
 
  Pass-On
 
Date 02-12-2020
Pass-On Subject D-Shift, Tuesday February 11th 2020
Pass-On Information •Boat & BS checked

•Apparatus checks

•Rope training

•Mass casualty trailer picked up from highways and returned to the warehouse.

•Supplies picked up from Harbor Freight and & DES.

•New female outlet put in on the air compressor discharged. The old one was leaking.

•Got Heavy duty latex gloves from harbor freight we can use for pump offs and stuff around the station, rather than using the expensive white ones.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Tuesday, February 11, 2020

Pass-On

 
 
  Pass-On
 
Date 02-10-2020
Pass-On Subject C-shift Pass On
Pass-On Information -Gator & Collapse Weekly completed w/ no new issues.

-Air in floor bladder of Dibb was very low.  Recommend keeping an eye on it and filling each morning.

-HFD used C-space equipment for new hire training.  Face pieces cleaned, cylinders filled and placed back in service.

-Kitchen weekly completed.

-Rope drill setup for this week.  Please leave barrels in place.

-Driver side rear compartment shelf had catastrophic failure and had to be removed.  All equipment from the shelf was relocated to lower shelf.  Further securing of equipment will be completed on 2/12.  Recommendations on long-term fix needed.

-Single bay door (Door #1) is OOS.  Drive sprocket retaining pin came out.  Was repaired but door movement tolerances are not correct.  Motor keeps running after door is closed. Sam contacting repair company.
Name Olson / Fraley
Email EngineDriver71@comcast.net