| |  | Pass-On |
| | | Date | 02-10-2020 | | Pass-On Subject | C-shift Pass On | | Pass-On Information | -Gator & Collapse Weekly completed w/ no new issues. -Air in floor bladder of Dibb was very low. Recommend keeping an eye on it and filling each morning. -HFD used C-space equipment for new hire training. Face pieces cleaned, cylinders filled and placed back in service. -Kitchen weekly completed. -Rope drill setup for this week. Please leave barrels in place. -Driver side rear compartment shelf had catastrophic failure and had to be removed. All equipment from the shelf was relocated to lower shelf. Further securing of equipment will be completed on 2/12. Recommendations on long-term fix needed. -Single bay door (Door #1) is OOS. Drive sprocket retaining pin came out. Was repaired but door movement tolerances are not correct. Motor keeps running after door is closed. Sam contacting repair company. | | Name | Olson / Fraley | | Email | EngineDriver71@comcast.net |
| | | | | |
|