Friday, February 14, 2020

Pass-On

 
 
  Pass-On
 
Date 02-14-2020
Pass-On Subject C-Shift
Pass-On Information -Attempted to pick up MAB from highways but they had already left for the weekend
-RS-20 cab lift is OOS
-Both squads fueled
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Thursday, February 13, 2020

Pass-On

 
 
  Pass-On
 
Date 02-13-2020
Pass-On Subject A Shift Pass-on
Pass-On Information •Apparatus checks completed.

•Rope training completed.

 Station chores done.

 Gator taken to john deere for service, Skid steer
 needed more work done and remained at john
 deere.

 BS20 fueled

 

 13706 Emily st. - vehicle fire next to a structure.

 

 



Name Clay Shealy
Email cshealy@washco-md.net
 
     
 
 

Wednesday, February 12, 2020

Pass-On

 
 
  Pass-On
 
Date 02-12-2020
Pass-On Subject D-Shift, Tuesday February 11th 2020
Pass-On Information •Boat & BS checked

•Apparatus checks

•Rope training

•Mass casualty trailer picked up from highways and returned to the warehouse.

•Supplies picked up from Harbor Freight and & DES.

•New female outlet put in on the air compressor discharged. The old one was leaking.

•Got Heavy duty latex gloves from harbor freight we can use for pump offs and stuff around the station, rather than using the expensive white ones.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Tuesday, February 11, 2020

Pass-On

 
 
  Pass-On
 
Date 02-10-2020
Pass-On Subject C-shift Pass On
Pass-On Information -Gator & Collapse Weekly completed w/ no new issues.

-Air in floor bladder of Dibb was very low.  Recommend keeping an eye on it and filling each morning.

-HFD used C-space equipment for new hire training.  Face pieces cleaned, cylinders filled and placed back in service.

-Kitchen weekly completed.

-Rope drill setup for this week.  Please leave barrels in place.

-Driver side rear compartment shelf had catastrophic failure and had to be removed.  All equipment from the shelf was relocated to lower shelf.  Further securing of equipment will be completed on 2/12.  Recommendations on long-term fix needed.

-Single bay door (Door #1) is OOS.  Drive sprocket retaining pin came out.  Was repaired but door movement tolerances are not correct.  Motor keeps running after door is closed. Sam contacting repair company.
Name Olson / Fraley
Email EngineDriver71@comcast.net
 
     
 
 

Sunday, February 9, 2020

Pass-On

 
 
  Pass-On
 
Date 02-08-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poff ON

    SCBA and Apparatus checks complete
    House chores complete
    delivered a barrel to the training center for the
          hazmat tech testing today. It was returned
          after class was over.

    Washed RS 20 and HM 20
    Weekly check on HM-20
         - RID eye charged
         - one PID needed calibrated other meters      
           were good. Cleared peaks and zeroed.
         - tire pressure was consistently low on all
           tires DJ said they should be kept at 100-
           120. We inflated them all to 110
         - washed unit
         - road tested with tire pressure changed,
           no problems found
         - fueled
       

#main street in Hancock for House Fire
RS-201 cancelled in route

    Fueled UT-203

Shift complete
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Saturday, February 8, 2020

Pass-On

 
 
  Pass-On
 
Date 02-07-2020
Pass-On Subject D-Shift, Friday February 7th 2020
Pass-On Information -RS20 checked. Ventis O2 sensor OOS. Spare meter placed on RS20.

-Apparatus checks

-Skid steer OOS. Taken to John Deere for maintenance.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Friday, February 7, 2020

Pass-On

 
 
  Pass-On
 
Date 02-07-2020
Pass-On Subject C-Shift
Pass-On Information -CS Equipment placed on 203.
-Rope Training
-RS-20 back in service, all equipment placed back on
-203 passed DOT
-Fraley Warehouse for ppe

Name Fraley/Olson
Email cfraley@washco-md.net