Tuesday, September 24, 2019

Pass-On

 
 
  Pass-On
 
Date 09-23-2019
Pass-On Subject C-Shift 9/23/19
Pass-On Information -Hazmat 20 taken to Atlantic for lighting repairs.  No ETA on return.

-1 dry-suit drying in bay from Inc#22152
Name Otter
Email enginedriver71@comcast.net
 
     
 
 

Saturday, September 21, 2019

EDIT: Pass-On

 
 
  Pass-On
 
Date 09-21-2019
Pass-On Subject D-Shift: Friday September 20th 2019
Pass-On Information •Apparatus checks
•Furnace was serviced and cleaned
•To DES
•Garden hose manifold returned
Name Austin McCoy
Email Amccoy@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 09-21-2019
Pass-On Subject D-Shift: Friday September 20th 2019
Pass-On Information •Apparatus checks
•Furnace was serviced and cleaned
•To DES
Name Austin McCoy
Email Amccoy@washco-md.net
 
     
 
 

Friday, September 20, 2019

Pass-On

 
 
  Pass-On
 
Date 09-19-2019
Pass-On Subject C-shift
Pass-On Information Equipment replaced from mvc
garden hose manifold missing from muddy mommas event
grass mowed
airbags not tested yesterday
Name Chris Fraley
Email cfraley@washco-md.net
 
     
 
 

Wednesday, September 18, 2019

Pass-On

 
 
  Pass-On
 
Date 09-17-2019
Pass-On Subject A crew
Pass-On Information Hose and Poffinberger ON

checked BS-20 and Boat 20.
    Washed and waxed BS
    Did motor maintenance on 40/60EFI
   
SCBA's checked and station maintenance completed

Petrogen torch training completed
     Had O2 cylinder refilled

Halfway Blvd just west of I-81  Pump off
     Recovered 300 gallons Diesel
     Had to offload twice at the station
     Replaced all materials used
     Used one wax ring (not replaced)
     Fueled HM-20

HM-20 problems:
     Red compartment open light continues t
     to flash despite all compartment doors
     being closed.
     Blue airline would not keep up with
     drilling operation. Switched to the ports
     and it kept up fine.
     Adapter to SCBA cylinder on the
     pressure control gauge is missing.
     Onboard Hydrocarbon is slow, slower
     then the old pump. We need to be able
     to control the pressure on the pump! The
     simple on/off switch is not adequate.

I am working on the MDE reports, I will turn it in tomorrow. All other paperwork is compete.

Shift complete
     
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Friday, September 13, 2019

Pass-On

 
 
  Pass-On
 
Date 09-12-2019
Pass-On Subject D-Shift: Thursday September 12th 2019
Pass-On Information -Units checked
-Cleaned upstairs and downstairs
-MDE training 0900-1230
-McCoy out for Knox Box stuff
-Lowes run to pick up air filters, new flag and new blinds for upstairs
-RS20-01 fueled
-New flag swapped out with old one
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Thursday, September 12, 2019

Pass-On

 
 
  Pass-On
 
Date 09-11-2019
Pass-On Subject C-Shift
Pass-On Information -203 checked
-MDE class
-BS-20 fueled
-Hazmat review and driving with A. Hopkins
-20-01's meter calibrated
Name Fraley
Email cfraley@washco-md.net