Date 09-17-2019
Pass-On Subject A crew
Pass-On Information Hose and Poffinberger ON

checked BS-20 and Boat 20.
    Washed and waxed BS
    Did motor maintenance on 40/60EFI
   
SCBA's checked and station maintenance completed

Petrogen torch training completed
     Had O2 cylinder refilled

Halfway Blvd just west of I-81  Pump off
     Recovered 300 gallons Diesel
     Had to offload twice at the station
     Replaced all materials used
     Used one wax ring (not replaced)
     Fueled HM-20

HM-20 problems:
     Red compartment open light continues t
     to flash despite all compartment doors
     being closed.
     Blue airline would not keep up with
     drilling operation. Switched to the ports
     and it kept up fine.
     Adapter to SCBA cylinder on the
     pressure control gauge is missing.
     Onboard Hydrocarbon is slow, slower
     then the old pump. We need to be able
     to control the pressure on the pump! The
     simple on/off switch is not adequate.

I am working on the MDE reports, I will turn it in tomorrow. All other paperwork is compete.