Tuesday, August 6, 2019

Pass-On

 
 
  Pass-On
 
Date 08-06-2019
Pass-On Subject 8-6-19 Pass On
Pass-On Information -Boat 20A bow section found deflated during morning checks.  Inflated and left next to Boat 20 for observation.  By lunch it was showing signs of deflating and by evening it is clearly leaking.  Removed from service.  K. Hose to be notified in AM (8/7).

-New HM20 placed in service.  Equipment moved over and made ready.  Review equipment placement.  Old HM20 placed in far bay, RS20-01 in old HM20 bay.  Once all equipment and supplies are removed it can be moved to Phoenix. Door openers switched between old HM20 and RS20-01.

-Pig-tail for Sup20-03 moved to RS20-01.  We do not have the proper female connection to make new one.  Will need to be picked up.

-Contaminated fuel pump off equipment is on loading dock by rear of Sup20-03.  Discussion was to have that equipment stored on Sup20-03.  Sam to make final decision on manner of storage of equipment.
Name Otter
Email enginedriver71@comcast.net
 
     
 
 

Sunday, August 4, 2019

Pass-On

 
 
  Pass-On
 
Date 08-03-2019
Pass-On Subject D-Shift Saturday August 3rd 2019
Pass-On Information •Picked up another poly barrel
•HM20 checked
Name Austin McCoy
Email Amccoy@washco-md.net
 
     
 
 

Saturday, August 3, 2019

Pass-On

 
 
  Pass-On
 
Date 08-02-2019
Pass-On Subject C-Shift
Pass-On Information -Two level A suites airing out, one needs marked to double glove due to liner being cut out.
-Support 20-05 radio id changed to boat support 20
-HM-20 mounting continued
-RS 20-01 not charging all the way
-All cylinders were filled
-Mister fans taken back to rehab 255
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Friday, August 2, 2019

Pass-On

 
 
  Pass-On
 
Date 08-01-2019
Pass-On Subject B-Shift 8-1
Pass-On Information -Level A entry made on Inc#17728 for reported chlorine leak. No evidence of leak found.  Suits airing out behind HM20.  C-Shift will handle placing back in service on 8/2.

-3 poly barrels for contaminated diesel dropped off.  

-Equipment mounting on HM20 started.
Name Otter
Email enginedriver71@comcast.net
 
     
 
 

Thursday, August 1, 2019

Pass-On

 
 
  Pass-On
 
Date 07-29-2019
Pass-On Subject 7/29/19 Pass-On
Pass-On Information -Used 1 barrel for contaminated fuel pump off.  Left on scene for tow/recovery company.  MDE notified and aware.

-Both diesel pumps stripped and cleaned after pump-off.

-Macro filter stripped down and cleaned, micro filter replaced.
Name Otter
Email enginedriver71@comcast.net
 
     
 
 

Wednesday, July 31, 2019

Pass-On

 
 
  Pass-On
 
Date 07-30-2019
Pass-On Subject Tuesday July 30th 2019
Pass-On Information -Physical agility testing
-BS20 & BT20 checked
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Monday, July 29, 2019

Pass-On

 
 
  Pass-On
 
Date 07-28-2019
Pass-On Subject B-shift
Pass-On Information Hose and Hoop

Checked equipment
Charged the TIC's

Water rescue  P. River co 11    BS/BT 20

Fueled UT-205

Station choirs complete

Shift completed

Name Hose
Email Khose@washco-md.net