Thursday, June 13, 2019

Re: Apparatus Maintenance Request - Keith Hose

 
  Apparatus Maintenance Request
 
Name Keith Hose
Date 06-13-2019
Email khose@washco-md.net
Unit RS20
Unit Status Out of Service
Description of Issue During our response to a reported house fire in Leitersburg, not all the emergency lights would turn on. The main strobe bars on the roof of the cab were working but none of the other emergency lights including the roto-Ray were operational. This includes the amber strobes on the back.
Once the call was down graded by command, Dave hit the emergency master to turn off the lights. At this point with the emergency master in the off position all the emergency lights that were not working, began to flash. The roof top bars turned off as they were suppose too.  In addition, the rear scene lights came on and were flickering. Dave pulled over, we shut down the squad and turn off the batteries. Restarted the unit and the problem continued. The lights remained flashing the entire trip back to the station.
I made contact with Sam and DJ. Placed the unit out of service with electrical problems.
 
     
 
 

Re: Small Equipment/SCBA Maintenance Request

 
  Small Equipment/SCBA Maintenance Request
 
Date 06-13-2019
Name Keith Hose
Email Khose@washco-md.net
Unit Equipment is Assigned to UT20
Equipment Status Out of Service
Equipment Replaced With Nothing
Description of Issue Two generators out of the IMT trailer. Generator #12 will not start. Generator #4 will start but will not run without the choke on.
Both need taken to Eby's to be worked on.
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 06-12-2019
Pass-On Subject Wednesday June 12th 2019
Pass-On Information •U203 checked
•Crews went to High Rock for training
•RS20 fueled
Name Austin McCoy
Email Amccoy@washco-md.net
 
     
 
 

Wednesday, June 12, 2019

EDIT: Pass-On

 
 
  Pass-On
 
Date 06-11-2019
Pass-On Subject 6-11-19
Pass-On Information - Officers face piece found with dip spit in nose cup.  

-HM20s battery was dead at shift change.  Charged for several hours then run on high idle for 30 minutes.  Check each morning to make sure charge took.

-Weekly on BT20 & BS20 completed.  Trailer was taken to Trailer Enterprise for repair on lights on 6/10.  Light still do no work.
Name David Tyler Olson
Email EngineDriver71@comcast.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 06-11-2019
Pass-On Subject 6-11-19
Pass-On Information - Officers face piece found with dip spit in nose cup.  

-HazMat battery was dead at shift change.  Charged for several hours then run on high idle for 30 minutes.  Check each morning to make sure charge took.

-Weekly on BT20 & BS20 completed.  Trailer was taken to Trailer Enterprise for repair on lights on 6/10.  Light still do no work.
Name David Tyler Olson
Email EngineDriver71@comcast.net
 
     
 
 

Monday, June 10, 2019

Pass-On

 
 
  Pass-On
 
Date 06-10-2019
Pass-On Subject B shift
Pass-On Information Gator checked
Collapse checked
Boat 20 lights fixed
Boat 20 trailer DOT inspection completed
Fueled sq-20
Checked MAB- communication with ecm light came on as well as check transmission light
Name Dj
Email Dhamrick@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 06-09-2019
Pass-On Subject A-shift
Pass-On Information Hose and Poffinberger ON
RS 20-01 checked
    -  all the saws and gas equipment ran
       Refueled and returned
    -  gas meters checked, cal date on
       them is 6/25/19. Charged the 5 gas
       overnight and returned this morning.
    -  zeroed and ran self tests, all were
       passed.
    -  light tower is still OOS.

Fire calls:

Salem Ave          House Fire       RS-20

Searched exposure, secured power and ventilated.
    -  cylinders filled and returned in packs
    -  face pieces cleaned
    -  rehab completed

National Pike    Mountain Rescue  RS-20,
Utility 20 w/ gator 20.

Ran gator up to Annapolis rock and evacuated one patient from the trail down to Pleasant walk access.
     - cleared several trees from the      access trail to the AT. Saw is fueled and put back.
     - gator didn't need fueled.

Station choirs complete.

Shift complete.
Name Keith Hose
Email Khose@washco-md.net