Friday, July 31, 2020

Pass-On

 
 
  Pass-On
 
Date 07-30-2020
Pass-On Subject A-Shift, Thursday July 30th 2020
Pass-On Information •Apparatus checks

•Grass mowed & trimmed

•Doors, grabrails, etc wiped down. Downstairs mopped. Bathrooms cleaned

•To county admin building, Bowers Marine, The Fire Store and NAPA.

•Replaced the key for the Chesapeake. The key in there was bent and starting to crack.

•Replaced the battery on the Chesapeake. The old one was reported to be bad. We checked it with the tester and it showed "weak"

•RS20-01 fueled

•While enroute to a call, RS20-01's low voltage light came on and the voltage dropped below 12. A  lot of built up on the terminals of the battery, they were cleaned. Still no difference.

•LCD took 1.5 hours to start up


INCIDENTS:

House fire- Cancelled enroute

Driver: Hose

Officer: McCoy

3rd: Shealy
Name McCoy, Shealy, Hose
Email Amccoy
 
     
 
 

Thursday, July 30, 2020

Pass-On

 
 
  Pass-On
 
Date 07-29-2020
Pass-On Subject C-Shift
Pass-On Information 203 checked

LCD still taking 40 mins to sample.

XL level B suite taken from rack and boots from the shed to perform decon. 1811 requested ops for decon while she was on board 492.

203 delivered and picked up fans at the Fire Academy  

HM20 washed

Bays swept and blown out with leaf blower.

Chesapeake Boat Battery found dead by Ben. Austin and Keith are checking it today.

New Unit checks are completed and on the table for review. I would like to start them sometime in August.
Name Fraley/Hamrick
Email cfraley@washco-md.net
 
     
 
 

Monday, July 27, 2020

Pass-On

 
 
  Pass-On
 
Date 07-27-2020
Pass-On Subject A Shift Pass-on
Pass-On Information Check off complete on GTR20 and collapse 20.

House chores completed

RS20 to HGR for ARFF training

RS20 fulled

15204 clear spring road for an entrapment canceled enrout.



Name Clay Shealy
Email cshealy@washco-md.net
 
     
 
 

Sunday, July 26, 2020

Pass-On

 
 
  Pass-On
 
Date 07-23-2020
Pass-On Subject C-Shift
Pass-On Information 201-checked, no new issues found.

LCD ran for 6 hours

Fraley to warehouse for PPE inventory

Shelf was cleared off for sets of water equipment in case a large scale flooding event occurs. This set up is just starting, as time goes on this may be changed.

Boat motor didnt run that well on the creek. Couldnt get on plain with shallow water conditions.

Axle on boat 20A's is bent.

Handlight Batterey needs replaced
Name Fraley/Hamrick
Email cfraley@washco-md.net
 
     
 
 

Saturday, July 25, 2020

Pass-On

 
 
  Pass-On
 
Date 07-24-2020
Pass-On Subject A-Shift, Friday July 24th 2020
Pass-On Information -RS20 checked

-Apparatus checks

-BT20A still leaking air

-RS20-01 fueled

-HM20 filled with DEF & fuel


INCIDENTS:

Building fire: Electrical issue

Veh into building: Cancelled

House fire: Electrical issue
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Thursday, July 23, 2020

Pass-On

 
 
  Pass-On
 
Date 07-23-2020
Pass-On Subject C-Shift
Pass-On Information RS-20-meters calibrated, cs equipment put back on, fueled, placed back in service.

RS-20 officer side, center support for awning has been removed

LCD ran for 30 mins, still displays wait

Mercury Overpack materials recovered from club road is in the Hazmat shed in a sealed mini drum. Sam is aware.

201-Driver's airpack was found with heads up display with double green with no air in the system. New regulator placed on pack with same results. Driver's pack moved to seat 3 of unit.

Boat was found low on air. After filling twice front of boat seems soft. Tow anchor reinforcement piece peeled off the boat, temporarily using the rope.

CS tote put back in the shed.

All station air filters changed

 

Name Fraley/Hamrick
Email cfraley@washco-md.net
 
     
 
 

Wednesday, July 22, 2020

Pass-On

 
 
  Pass-On
 
Date 07-21-2020
Pass-On Subject A-Shift, Tuesday July 21st 2020
Pass-On Information -BT20A, BT20C and BS20 checked

-Apparatus checks

-RS20-01 to daycare on Elliott Parkway for Pub Ed

-Gas cans from gray cabinet filled

-LCD 3.3 placed in a case on the hazmat

-Gator fueled

-Training on LCD & Dalgren decon

-House chores

-Boat parts ordered
Name McCoy/Hose
Email amccoy@washco-md.net
 
     
 
 

Tuesday, July 21, 2020

Pass-On

 
 
  Pass-On
 
Date 07-20-2020
Pass-On Subject C-Shift
Pass-On Information Unit checks-Gator and Collapse

LCD meter training-Start meter every morning and let it sample

Dewalt Battery taken off 20-01 after charger read powerline problem.

New unit specific check out sheets will be coming soon!

Squad 20 and Boat 20 still O.O.S.
Name Fraley/Hamrick
Email cfraley@washco-md.net
 
     
 
 

Thursday, July 16, 2020

Pass-On

 
 
  Pass-On
 
Date 07-16-2020
Pass-On Subject B-Shift
Pass-On Information BT-20 taken to DIB.
Chesapeake moved from its trailer to the sled trailer.
Inventoried water rescue equipment.
Name Benjamin E Hoopengardner
Email bhoopengardner@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 07-15-2020
Pass-On Subject A crew
Pass-On Information Hose AO, McCoy EO, Shealy FF

Equipment and SCBA checks

Station chores complete

Boat 20 floor was deflated.
    - found a couple holes under the transom
    - transom was broken and exposed
    - placed OOS
    - boot and studs transferred to BT-20 C
    - removed motor in prep for taking it to DIB
    - equipment relocated to BT-20 C
    - bag of victim life vests placed in the back of
    BS
    - taking Boat 20 to DIB on Thursday morning

BT 20 A filled with air and gas
    - spare gas cell for BT-20A in the back of
    BS

Installed a battery tender on BT-20C

Docking Station fixed
    - all meters have been calibrated.

Weekly on UT 203 complete

Tank for station gas grill filled

New lettering painted on BT-20C

No calls

Shift Complete

   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Wednesday, July 15, 2020

Pass-On

 
 
  Pass-On
 
Date 07-14-2020
Pass-On Subject Hamrick/Fraley
Pass-On Information -Unit checks-found boat 20's floor flat

-203 electrical issues fixed

- confined space equipment loaded onto 203

-trash pump repaired and placed back onto the wall ledge

-Absorbent skid delivered

-Had to put air in the boat at 730 yesterday evening.

-IT did not make it here today, docking station still down.
Name Fraley/Hamrick
Email cfraley@washco-md.net
 
     
 
 

Monday, July 13, 2020

Pass-On

 
 
  Pass-On
 
Date 07-12-2020
Pass-On Subject A-Shift, Sunday July 12th 2020
Pass-On Information -RS20-01 checked

-Polly boot from the Chesapeake was removed and placed on Boat 20

-House chores

-BS20 washed & waxed

-BS20 fueled

-RS20-01 fueled

-BT20 fueled


INCIDENTS:

-Inaccessible-Stagged

-Water rescue #1- Cancelled

-Water rescue #2- Launched boat 20 and went up stream to retrieve the patient. Patient loaded onto the boat and brought back down to Synders Landing  
Name McCoy/Shealy/Hose
Email amccoy
 
     
 
 

Sunday, July 12, 2020

Pass-On

 
 
  Pass-On
 
Date 07-11-2020
Pass-On Subject 7-10 thru 7-11 Pass On
Pass-On Information C-Space equipment used for class.  Cleaned, inspected, tagged, and ready for use.

BT20 poly boot found damaged from rock strike.  Recommend we swap the boot from the Chessie till we get a replacement.  Also recommend we inspect the motor after each use to find damage early.

RS20 weekly (7-10) and HM20 weekly (7-11) completed.  Meters need cal.  1 RadEye battery was completely dead. Does not look like it was charged.

LCD 3.3 meter placed on HM20.  Both LCD 3.3 and Dahlgren training to take place the 20th-22nd.
Name Otter
Email dolson@washco-md.net
 
     
 
 

Thursday, July 9, 2020

EDIT: Pass-On

 
 
  Pass-On
 
Date 07-08-2020
Pass-On Subject D-Shift, Wednesday July 8th 2020
Pass-On Information -U203 wouldn't start. EVS called

-Bathrooms cleaned

-IT fixed the internet. Meter docking station still not working. Boyd is working on that.

-HM20 washed, waxed and cab cleaned

-EVS came to look at U203. Found a lot of lead build up on some of the terminals on the batteries. Cleaned those off and started just fine multiple times.

-To DES for Drager scba demo

-RS20-01 fueled


INCIDENTS

-Veh into building-Cancelled

-House fire- #JobTown
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 07-08-2020
Pass-On Subject D-Shift, Wednesday July 8th 2020
Pass-On Information -U203 wouldn't start. EVS called

-Bathrooms cleaned

-IT fixed the internet. Meter docking station still not working. Boyd is working on that.

-HM20 washed, waxed and cab cleaned

-To DES for Drager scba demo

-RS20-01 fueled


INCIDENTS

-Veh into building-Cancelled

-House fire- #JobTown
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Tuesday, July 7, 2020

Pass-On

 
 
  Pass-On
 
Date 07-06-2020
Pass-On Subject B-Shift, Monday July 6th 2020
Pass-On Information •Gator and collapse checked

•Apparatus checks

•Hose took the K12 that was OOS off of RS20 to Eby's for repair

•Officer window on RS20 off the track and wouldn't go up or down. That was repaired.

•IT came out to look at the internet. Still isn't working

•Hotspot from RS20 is upstairs to run the CAD screen


Incidents:
Grill fire, cancelled
Name McCoy/Olson
Email amccoy@washco-md.net
 
     
 
 

Sunday, July 5, 2020

Pass-On

 
 
  Pass-On
 
Date 07-05-2020
Pass-On Subject D-Shift, Saturday July 4th 2020
Pass-On Information •HM20 checked

•Apparatus checks

•BS20 fueled and filled with DEF

•RS20-01 fueled


INCIDENTS:

•House Fire-BS

•Water rescue-canceled
Name McCoy/Shealy
Email Amccoy
 
     
 
 

Saturday, July 4, 2020

Pass-On

 
 
  Pass-On
 
Date 07-03-2020
Pass-On Subject C-Shift
Pass-On Information Internet server down, can not calibrate meters

K-12 was pulled from rs-20, trouble starting and sounds muffled.

Rope edge protection added to each rigging bag.

Grass mowed and trimmed
Name Fraley/Hose/McCoy
Email cfraley@washco-md.net
 
     
 
 

Wednesday, July 1, 2020

Pass-On

 
 
  Pass-On
 
Date 06-30-2020
Pass-On Subject D-Shift, Tuesday June 30th 2020
Pass-On Information -BS20 & BT20 checked

-Apparatus checks

-McCoy worked on scheduling

-To CO10 for knox box stuff

-To CRS to swap O2 cylinders

-More scheduling


INCIDENTS

-Building fire: Small fire, no need for us

-Water rescue: Cancelled enroute
Name McCoy/Shealy
Email amccoy@washco-md.net