Date 05-29-2020
Pass-On Subject D-Shift, Friday May 29th 2020
Pass-On Information -RS20 checked. Light tower didn't want to pan & the ATC light was on. Dj made aware, advised it's been coming on and off, but the squad doesn't even have ATC, so not to worry about it.

-Upstairs and downstairs cleaned up

-All 3 HVAC filters changed

-Grass mowed

-Mower 20 fueled

-New locks put on sheds, gate and fuel tank. Now it is one key for all 4 locks. New electric lock box mounted on side of shed with key in it.
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Friday, May 29, 2020

Pass-On

 
 
  Pass-On
 
Date 05-28-2020
Pass-On Subject C-Shift
Pass-On Information -Most water equipment put back on the boat support. If you are missing equipment check the boat support.

-Stokes on RS-20 was built to mirror our training set up.

-Approval for warehouse boat trailer to be used for little boat.

-One decon, Community action counsel transport bus.

-While on a call, made access to 340 launch and found it is better to pull in and turn around closer to the river, off the towpath.


Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Wednesday, May 27, 2020

Pass-On

 
 
  Pass-On
 
Date 05-26-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poff ON

   equipment and SCBA checks
   Checked BS, boat 20 and boat 20 A
         Inflated both boats
         Exercised Boat 20 motor.
         Boat 20A needs some seam work. I will
             be taking it out of service soon to patch
             them.
   Cleaned and Sanitized station

   Equipment put back on RS-20

   Filled DEF on HM-20

   Hazmat Call behind Pope Tire
        Acetylene tank was on fire, once out the
        relief valve wouldn't close.
        One 5 gal. Bucket and Salt Tub at training
             center. Used to transport leaking cylinder
             and cool it further.

   House Fire on Salem Ave. staged then placed in
        service.
 
     
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Tuesday, May 26, 2020

Pass-On

 
 
  Pass-On
 
Date 05-25-2020
Pass-On Subject D-Shift, Monday May 25th 2020
Pass-On Information -Gator & Collapse checked. It appears there is new damage to the officer side front of the collapse trailer. Two holes and two spots lower near the stripe that was rubbed against.

-Apparatus checks
Name McCoy/Shealy
Email amccoy
 
     
 
 

Monday, May 25, 2020

Pass-On

 
 
  Pass-On
 
Date 05-24-2020
Pass-On Subject C-shift Pass On
Pass-On Information Classroom was setup for upcoming decon assignment.  Please leave it in the current configuration.  More info to come.

Responded to TT MVA with heavy entrapment.  100+ gallons of diesel offloaded after pt removed.  Offload pump was unable to move the diesel up the hill.  Portable pump placed in system as rely pump.  Needed to take filter adapters apart to build adapter on scene to get hoses to connect.  After return to station a filter adapters returned to normal and double male and double female adapters w/ shutoffs build and placed on unit.

Weekly completed on RS20-01.  
-Cutters Edge seems to be puking bar oil.  Cleaned and oil adjusted down to almost closed.  Keep an eye on it.  
-Please remember to refill the mix fuel cans when they get to ½.  Both were almost empty.  
-All cribbing is now on officers side over wheels (step chocks fell over and were blocking the extrication compartment door from opening).  
-Extra hand tools (shovels, trash hook, etc) moved to top shelf in drivers side over the wheel compartment.  
-Stokes with new bridle setup added.

Some equipment was moved around on HM20.  
-Trash cans and buckets from decon compartment up top w/ cones.  
-Wheeled cart added to decon compartment.  Handle can be attached with snap clip.
-Body bags removed from officers' side rear compartment.  
-Chem pump-off equipment and hydrocarbon fiber absorbent switched (keeps people away from the stay dry).  
-Chlorine kits and drum patching equipment switched (shelf damage from weight of Chlorine kits).
Name Otter / Fraley
Email dolson@washco-md.net
 
     
 
 

Friday, May 22, 2020

Pass-On

 
 
  Pass-On
 
Date 05-21-2020
Pass-On Subject D-Shift, Thursday May 21st 2020
Pass-On Information -Hazmat training 0800-1200

-McCoy worked on scheduling for a couple hours

-Shealy Mowed grass

-1 EMS call
Name McCoy/Shealy
Email amccoy
 
     
 
 

Thursday, May 21, 2020

Pass-On

 
 
  Pass-On
 
Date 05-20-2020
Pass-On Subject C-Shift
Pass-On Information 203 checked, still will occasionally shut off after starting. Siren O.O.S.

Squad 20 was expected back on 5/20 but was not delivered, confined space equipment is on bay floor

Water rescue skills day lesson plan was created and email sent out.

Both rigging and attendant bags were sealed. 540's were pulled and a double pulley was added to move towards mirrored 5:1 lines.

Hazmat training completed

Went to jobtown twice, hand tools sprayed off.  
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Monday, May 18, 2020

Pass-On

 
 
  Pass-On
 
Date 05-18-2020
Pass-On Subject D-Shift, Sunday May 17th 2020
Pass-On Information -RS20-01 checked

-Apparatus checks

-Scheduling worked on

-Purchased two window A/C units and installed them in the bunkrooms

-Purchased 3 sheets of 3/4 plywood and re-stocked the collapse

-RS20-01 fueled
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Sunday, May 17, 2020

Pass-On

 
 
  Pass-On
 
Date 05-16-2020
Pass-On Subject C-shift Pass On
Pass-On Information -HM20 weekly completed.  3 SCBA had dead HUD batteries and were replaced.  Batteries removed from voice amps and placed in battery box to avoid corrosion.  Batteries removed from Draeger CMS unit and left in box.  All Draeger tubes consolidated into 1 case.  Empty meter case removed as well.

-Level B suit inventory changed.  Encapsulating B suits removed.  6 flash protection suits added.  4XL suits reduced to a total of 3, 4 XL Tychem CPF3 suits added.  Bags for all suits clearly labeled.

-Boats were checked in preparation for the potential TS.  Please run the motor each morning.  Its been slow to start.
Name Olson / Fraley
Email dolson@washco-md.net
 
     
 
 

Saturday, May 16, 2020

Pass-On

 
 
  Pass-On
 
Date 05-15-2020
Pass-On Subject B-crew
Pass-On Information Hose (trade for DJ) and Hoop

    Apparatus checks
   
    Checked RS-20

    Blew out bays

    Washed RS-20 and BS-20

    Assisted HCC with unloading hospital beds

    Put the water fitting on the 2-stroke and ran
         Boat motor for 20min.
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Friday, May 15, 2020

Pass-On

 
 
  Pass-On
 
Date 05-14-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poffinberger
   
    Apparatus and SCBA checks
        No face pieces on either RS. Can we put
        some spares back on in case someone
        forgets or damages theirs on a call?

    No weekly checks with UT-20 OOS
 
    Placed the concrete chainsaw back in service.
         I cleaned the spark plug and adjusted the
         gap spacing. I also adjusted the throttle
         (idle) speed. After working on it we allowed
         It to run for about 30 mins. Fueled it and
         placed it back on RS-20.

    Switched the cast Aluminum boot on the 2-
         stroke 40 with the rock proof off the EFI 40.
         Put the garden hose fitting in and did a run
         test on the motor.
         Remember to prime the fuel line with the
         bulb, then press in on the key for a few
         seconds to prime the carb. Doing both of
         these steps first the motor fires off no
         problem.

    if you guys are going to do more than turn it on
    and immediately shut it back off, the hose
    fitting has to be installed and cold water
    running to let it idle. The hose fitting doesn't
    supply enough water to allow you to throttle up
    but you can let it idle and move some gas
    Through the lines.

    Grass mowed
   
    Tire workout

    Station cleaned

    Two hazmat calls, one we assisted the owner in
    pumping fuel into a spare fuel cell.

    One PUI decon

Shift complete


 
   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Thursday, May 14, 2020

Pass-On

 
 
  Pass-On
 
Date 05-13-2020
Pass-On Subject D-Shift, Wednesday May 13th 2020
Pass-On Information •U203 checked-Siren not working. Found a loose wire. C shift will work on it on Saturday

•0900-1200 rope training at the training center

•McCoy worked on scheduling for a couple hours

•1 box alarm (no fire)

•1 decon. Exchanged 1 Medium raincoat. The dirty one was deconed and is hanging up out back to dry and air out
Name McCoy/Shealy
Email amccoy
 
     
 
 

Wednesday, May 13, 2020

Pass-On

 
 
  Pass-On
 
Date 05-12-2020
Pass-On Subject C-Shift
Pass-On Information -SCBA's were cleaned after finding debris in them from Prospect Street. Found front SCBA switched to the back without being cleaned.

-Lumber removed from 203 and placed back by the rack. Paslode gun was found off the trailer, dirty, case was empty of supplies, and with a dead battery. Items in the trailer were not put back from the fire on Prospect. This was also missed on the weekly checks with no notes made.

-Radio mant. was here and identifiers were changed. Two assigned to the Boat Support and Hazmat, and remaining four are to float.

-Looking into getting a connection for propane tanks when flaring them.

-Decon tent taken down and placed by gasoline cabinet in case needed.

-Two SCBA facepieces found in units. If you are missing yours, see Austin.
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Tuesday, May 12, 2020

EDIT: Pass-On

 
 
  Pass-On
 
Date 05-10-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON.

    At the request of the FM's office we went to the
    fire scene at prospect st to assist FM's office
    with covering holes in the floor. They requested
    we assist with overhaul. we returned to the
    station around 1400.
          Used 3 sheet of plywood out of the collapse
          trailer.  3/4 x 4x8'  McCoy was notified.


    Cleaned tools and vent master off 201.
         vent master is missing the parts for the
         depth gauge but still in service.

    Weekly check on RS-201
    Cleaned SCBA regulators on 201
    Sanitized and cleaned station
 
    Fueled RS- 20
   
    Cleaned macro filter on HM-20

    Shift complete
   
   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 05-10-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON.

    At the request of the FM's office we went to the
    fire scene at prospect st to assist FM's office
    with covering holes in the floor. They requested
    we assist with overhaul. we returned to the
    station around 1400.
          Used 3 sheet of plywood out of the collapse
          trailer.  3/4 x 4x8'  McCoy was notified.


    Cleaned tools and vent master off 201.
         vent master is missing the parts for the
         depth gauge but still in service.

    Weekly check on 203
    Cleaned SCBA regulators on 201
    Sanitized and cleaned station
 
    Fueled RS- 20
   
    Cleaned macro filter on HM-20

    Shift complete
   
   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 05-10-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON.

    At the request of the FM's office we went to the
    fire scene at prospect st to assist FM's office
    with covering holes in the floor. They requested
    we assist with overhaul. we returned to the
    station around 1400.
          Used 3 sheet of plywood out of the collapse
          trailer.  3/4 x 4x8'  McCoy was notified.


    Cleaned tools and vent master off 201.
         vent master is missing the parts for the
         depth gauge but still in service.

    Weekly check on 203
    Cleaned SCBA regulators on 201
    Sanitized and cleaned station
 
    Fueled RS- 20
   
    Cleaned macro filter on HM-20

    Shift complete
   
   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Sunday, May 10, 2020

Pass-On

 
 
  Pass-On
 
Date 05-09-2020
Pass-On Subject D-Shift, Saturday May 9th 2020
Pass-On Information •Hazmat checked. 4-MX6 meters calibrated

•Apparatus checks

•Rode around on hazmat 20 for an hour for hero appreciation

•Offloaded 50-75 gallons of fuel from a tractor trailer

•Ran a working fire. Items used: Two SCBAs, 2 hooks and the cutters edge saw off RS20-01. The chain guard on the saw came apart while in used by LT27.  Only able to find one part.

•A-Shift advised they'd take care of getting equipment cleaned up, Macro filter on hazmat cleaned and finish offloading the fuel on the hazmat (It was almost done). Thank you!!
Name McCoy/Shealy
Email Amccoy
 
     
 
 

Saturday, May 9, 2020

Pass-On

 
 
  Pass-On
 
Date 05-08-2020
Pass-On Subject C-shift Pass On
Pass-On Information -RS20 weekly completed w/ no new issues found.

-Concrete chain saw repaired and back in service on RS20

-3 new APEX8000 radios placed in service.  All APEX8000 radios will be reprogrammed with Franklin County channels and new aliases on Tuesday.

HM20 will have a total of 8 radios. The current 6 STX2500 for Level A suit operations remain unchanged.  2 new APEX8000 radios have been added for general operations as these have stronger transmitting power and will have a broader fleet map of mutual aid channels.  These 2 radios will have aliases of HM20 Foxtrot (HM20F) & HM20 Golf (HM20G).

BS20 will have a total of 3 radios.  The STX2500 that is setup for use with the water bag and headset remains.  2 new APEX8000 have been added. These radios water waterproof to 30' so they can be exposed to the water environment.

Support 20-03 will continue to have 1 STX2500.  No change there.

There will be 4 APEX8000 that are labeled CO20 Alpha thru Delta.  These are float radios designated for our everyday use.  They have not been assigned to a specific unit because we jump from unit to unit on a daily basis.  

There are also 5 spare STX2500 radios.  These will be stored somewhere in the station until needed.  New batteries for these will be purchsed in the coming weeks...I hope.
Name Olson / Fraley
Email dolson@washco-md.net
 
     
 
 

Thursday, May 7, 2020

Pass-On

 
 
  Pass-On
 
Date 05-06-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON

    Apparatus and equipment checks
    SCBA checks
    Mowed grass
    Cleaned and sanitized station
    Weekly check on 203
    Fueled 201

No calls

Shift complete
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Wednesday, May 6, 2020

Pass-On

 
 
  Pass-On
 
Date 05-05-2020
Pass-On Subject D-Shift, Tuesday May 5th 2020
Pass-On Information -BT20 & BS20 checked

-Apparatus checks

-Olson & Fraley to HFD training center to test out new airpacks

-Worked on some scheduling stuff

Name McCoy/Shealy
Email amccoy
 
     
 
 

Tuesday, May 5, 2020

EDIT: Pass-On

 
 
  Pass-On
 
Date 05-04-2020
Pass-On Subject C-Shift
Pass-On Information -Gator and Collapse checked, plastic and nails were added to collapse from 201.

-Wood strip on gator trailer will be coming soon

-One decon rack moved outside to provide 360 degree spraying without flipping the jacket.

-Bleach solution in the sprayer should be emptied after each decon and rinsed with fresh water.

-Foam pads are accounted for and should be picked up this week.

-WCSO unit 5501 was deconned PUI-Standard
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 05-04-2020
Pass-On Subject C-Shift
Pass-On Information -Gator and Collapse checked, plastic and nails were added to collapse from 201.

-Wood strip on gator trailer will be coming soon

-One decon rack moved outside to provide 360 degree spraying without flipping the jacket.

-Bleach solution in the sprayer should be emptied after each decon and rinsed with fresh water.

-Foam pads are accounted for and should be picked up this week.

Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Sunday, May 3, 2020

Pass-On

 
 
  Pass-On
 
Date 05-02-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poff ON

    Equipment and SCBA checks
    Weekly check in hazmat 20
         Calibrated 2 meters, a 4 and 5 gas. The
         other don't need calibrated for another 9
         days.

     BS-20 Fueled
         I bought more foam pads to dress out on
         top of. Please don't throw these away. Not
         what happened to the old ones but
         reguardless there is two new ones.

     SQUAD 20 fueled
     
     Grass mowed

     PT- tire workout

     
     
Name Keith Hose
Email Khose@washco-md.net