Tuesday, March 31, 2020

Pass-On

 
 
  Pass-On
 
Date 03-30-2020
Pass-On Subject D shift, Monday March 20th 2020
Pass-On Information -Gator and collapse checked

-Scheduling stuff

-House cleaning

-Picked up 90 rain coats

-Shawn Hartsock picked up 203 and took MCC2 and the old John boat trailer to highways


Name Austin McCoy
Email Amccoy@washco-md.net
 
     
 
 

Sunday, March 29, 2020

EDIT: Pass-On

 
 
  Pass-On
 
Date 03-28-2020
Pass-On Subject B-shift
Pass-On Information Hose (24 OT) and Hoop

    Decontaminated and cleaned station
    Apparatus and SCBA checks complete

    Hazmat 20 weekly check complete
          Calibrated meters
          HM-20 3 (5 gas) HCN sensor failed      
                replaced with spare 2
          Meters all zeroed and peaks cleared
          RID EYE battery charged
 
    HCN Cal gas is low, Morgan has been notified

    (3)  PUI decontaminations
          Face piece cleaned
          Used another 45 min cylinder off RS-201

    Finished cleaning and blowing out petrogen
          torch tip. It should be tested before going
          back in service. A lot of the ports were
          Clogged with slag.


Shift complete

         
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 03-28-2020
Pass-On Subject B-shift
Pass-On Information Hose (24 OT) and Hoop

    Decontaminated and cleaned station
    Apparatus and SCBA checks complete

    Hazmat 20 weekly check complete
          Calibrated meters
          HM-20 3 (5 gas) HCN sensor failed      
                replaced with spare 2
          Meters all zeroed and peaks cleared
          RID EYE battery charged
 
    HCN Cal gas is low, Morgan has been notified

    (2) PUI decontaminations
          Face piece cleaned
          Used another 45 min cylinder off RS-201

    Finished cleaning and blowing out petrogen
          torch tip. It should be tested before going
          back in service. A lot of the ports were
          Clogged with slag.


Shift complete

         
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Saturday, March 28, 2020

Pass-On

 
 
  Pass-On
 
Date 03-27-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poff

    Apparatus and SCBA checks
   
    Weekly check on SQUAD 20
        Gas meters calibrated
        Cascade cylinders are at 2000psi, we will be
             getting them filled with SCBA cylinders
        Cleaned tip on Oxy/acetylene torch
   
    Cleaned and filed ports on Petrogen Torch
   
    Antietam Tractor dropped off two tires for PT
    Purposes. Both have been deconed and placed
    outside by the fuel tank. Great workout!

   
    Station cleaned and Decontaminated
CALLS:
    (1) initial decon 26-8
    (2) PUI decons 79-1 and 75-9
          75-9 was deconed by 1811 while we were
          on other calls.
    (3) alerted for 3 house fires -all boomerangs-
    (4) SAR case at High Rock

Shift Complete

Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Friday, March 27, 2020

Pass-On

 
 
  Pass-On
 
Date 03-26-2020
Pass-On Subject D-Shift, Thursday March 26th 2020
Pass-On Information -Apparatus checks

-More cleaning supplies purchased

-Station chores and disinfection

-Grass mowed

-HM20 washed

-RS20, RS20-01 & HM20 fueled

-Deconed two ems transport units
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Thursday, March 26, 2020

Pass-On

 
 
  Pass-On
 
Date 03-25-2020
Pass-On Subject C-Shift
Pass-On Information -203 checked nothing significant
-Bad batch with the decon gun, a replacement is being sent
-Petrogen torch maint. still OOS
-Ambulance Decon log created, placed in the watch office
-Reviewed Decon procedures
-Decon was performed on 751,755,269
-Use Decon gun in the off position
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Tuesday, March 24, 2020

Pass-On

 
 
  Pass-On
 
Date 03-23-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poffinberger
   
    Apparatus and SCBA checks completed
    Weekly check on Collapse and Gator
    Decon Training
    Cleaned the entire station and Lysoled
         all touchable surfaces
    2-stoke motor maintenance complete

    Gas powered equipment exercised on SQ 20 &
         RS-201
   
    Poff tapped new treads in for the decon area
         work light and re-assembled.

    I'm going to be re-gluing gaskets into Drysuits
         next shift. I needed more glue and finally
         finished making all the new molds. If you
         see suits laying out please leave them alone
         they need time to dry in between coats.
         
    One call to CHestnut Grove Rd "boomerang"
   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Monday, March 23, 2020

Pass-On

 
 
  Pass-On
 
Date 03-22-2020
Pass-On Subject D-Shift, Sunday March 22nd 2020
Pass-On Information -RS20-01 checked

-Apparatus checks

-Scheduling stuff throughout the day

-Assisted getting the decon stuff set up for deconing ambulances

-Tag removed from fuel tank. It's be discussed and the decision was made to use the fuel up until the tank reaches a half tank. Keep a half tank as a reserve.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Sunday, March 22, 2020

Pass-On

 
 
  Pass-On
 
Date 03-21-2020
Pass-On Subject C-shift Pass On
Pass-On Information -Hazmat weekly completed. RIIDEye batteries were completely dead.  Might need to leave on charge.  C-shift will investigate further.

-BS20, RS20-01, HM20, and Sup20-03 fueled.

-Started to clear and rearrange bays for pending decon assignment.

-Multiple Level-B suits, additional water and MREs picked up from warehouse.

-Decon supplies ordered.

-Used 4 bags of granular on Inc#6447.  2 bags given to Co16 for replacement.  Replaced on HM20.

-80gal diesel offloaded into yard take from Inc#6479.

-180gal diesel offloaded into yard take and tote in shed from Inc#6494.  Yard tank is full, all additional fuel to be placed in tote in shed.
Name Olson / Fraley
Email EngineDriver71@comcast.net
 
     
 
 

Friday, March 20, 2020

Pass-On

 
 
  Pass-On
 
Date 03-19-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poffenberger ON

    Apparatus checks
    Thoroughly cleaned and disinfected station
    Offloaded fuel into yard tank from D-crews
         pump off.
   
    Cleaned Macro filter
    Restocked Hazmat with sorbent

    COVID-19 Training

    Took a load of surplus to Phoenix, palletized it
    and placed in the cage.

    We were advised to Hoard fuel. Not to use the
    yard tank to fill apparatus.

    Took two office cubical panels to the airport

    Alerted for 2 building fires both were
         boomerangs

Shift complete

   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Thursday, March 19, 2020

Pass-On

 
 
  Pass-On
 
Date 03-18-2020
Pass-On Subject D-Shift, Wednesday March 18th 2020
Pass-On Information -U203 checked

-McCoy worked on scheduling throughout the day

-U203 to Carlise to pick up bottled water

-We now have 2 full skids of water locked in the cage in the bay

-Ran errands to Sam's Club, Martins, Lowes, DES & Eby's

-The generator from WMD trailer was picked up and put back on the trailer. The hole saw was picked up as well

-U203 fueled
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Wednesday, March 18, 2020

Pass-On

 
 
  Pass-On
 
Date 03-17-2020
Pass-On Subject C-Shift, Mach 17th 2020
Pass-On Information -BT20 & BS20 checked

-Apparatus checks

-Picked up tent from MMC, took it to the warehouse, picked up the tent they wanted, took it back to MMC.

-Gas cans in the station were empty. They've been filled

-Station yard tank is NOT to be used for refilling apparatus at this time per FOM Anderson

-Signs posted at CO20, CO25 & CO35

-RS20-01 fueled

-McCoy worked on PT scheduling

-PAPRs placed on HM. 3 compartment on driver side

-Ice machine torn apart and cleaned
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Monday, March 16, 2020

Pass-On

 
 
  Pass-On
 
Date 03-15-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poff ON

    Sanitized Station
    Equipment and SCBA's checked
    Poff did his N95 fit test
    Boat 20 filled with air- very low.
    Training: Zack Reid and C. Sipes Upstaffed
          Launched from river bottom.
          Four people in the boat creates a weight
                issue. Dropped to 3 and the problem
                went away.
          Worked on long turns, short turns on plane
                and J-turns. Worked on jumping up on
                plane in a small area. General ops
    Boat 20 after use maintenance completed
          Greased, fueled, filled 2 stroke oil, replaced
          missing fill port gaskets and greased them.
    Checked RS-201
    Sanitized the station before bed.
    Sanitized before shift change.

    1 call HFD BOX... yet again another boomerang

SHIFT COMPLETE
   


Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Sunday, March 15, 2020

Pass-On

 
 
  Pass-On
 
Date 03-14-2020
Pass-On Subject D-Shift, Saturday March 14th 2020
Pass-On Information •HM 20 checked

•Apparatus checks

•N95 fit testing
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Thursday, March 12, 2020

Pass-On

 
 
  Pass-On
 
Date 03-11-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON

EQuipment and SCBA's checked

Weekly on 203 completed.

Collapse training

Returned mass casualty trailer to Pheonix
 
     Unloaded the skid of sorbent off 203
     Picked up GEN 10 off WMD trailer, it's at Eby's

Station chores complete

PT at PAL



Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Wednesday, March 11, 2020

Pass-On

 
 
  Pass-On
 
Date 03-10-2020
Pass-On Subject D-Shift, Tuesday March 10th 2020
Pass-On Information -BS20 & BT20 checked

-Apparatus checks

-Training

-RS20-01 fueled

1: HM20 to MMC to assist staff from 26's ambulance to doff their zyvek suite from a possible PUI patient.

2: HM20 to I70/I68 for a TT rollover. Pumped off about 80 gallons
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Sunday, March 8, 2020

Pass-On

 
 
  Pass-On
 
Date 03-07-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poffinberger ON

    Checked apparatus and SCBA's
 
    Checked Hazmat 20
   
    Station choirs completed

    Three fire calls, all Boomerangs!

    PT at PAL

    SHIFT COMPLETE
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Saturday, March 7, 2020

Pass-On

 
 
  Pass-On
 
Date 03-06-2020
Pass-On Subject D-Shift, Friday March 6th 2020
Pass-On Information -RS20 & apparatus checks

-House chores

-Collapse 20 taken to Trailer Enterprise. Front passenger side tire had a deep cut in it. The tire was replaced with a new one.

-MAB18 checked. It would not start. There is a charging issue with the auto charger.

- HM20, RS20-01 & 1820 to MMC ER to assist setting up tents.

-Fire-X came to the station for their annual inspection of the fire extinguishers. They missed the ones on RS20-01 & HM20 due to us being at MMC. Those extinguishers were taken to Fire-X to get inspected.

-Exchanged oxygen cylinder from RS20's slice pack at Robert's Oxygen

-RS20-01 fueled

-RS20-01's & HM20's extinguishers picked up
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Friday, March 6, 2020

Pass-On

 
 
  Pass-On
 
Date 03-05-2020
Pass-On Subject C-shift Pass On
Pass-On Information -Stanley tools cleaned up from training.  Placed on 20-03.  Tarp will cover power unit in coming days.

-New torch consumables box purchased and placed in torch compartment.  Consumables for all torches are in this box.

-Oxy torch regulators, hoses, and torch organized and placed in Milwaukee bag.  New strikers purchased and placed in bag.

-Petrogen torch remains OOS.  New female couplings for fuel line ordered.  Equipment organized and placed in crate. New strikers purchased and placed in crate.

-Slice pack O₂ empty, needs cylinder swap.  Remaining torch fuels are good.  C-shift will tag cylinders Monday 3/9 with psi levels.

-Cutters Edge concrete chain saw OOS w/ broken chain.  Replacement plan in the works.

-Bottle of marine motor oil ruptured in transverse tray on RS20-01.  Pads placed under stabilization bins until extensive clean can take place.
Name Olson / McCoy
Email dolson@washco-md.net
 
     
 
 

Wednesday, March 4, 2020

Pass-On

 
 
  Pass-On
 
Date 03-03-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poffinberger ON

    checked Apparatus and SCBA
    Weekly on BS-20, Boat 20
   
    Torch and Stanley Tool training

    Filled Arc Air Oxygen Cylinder and the oxygen
    for the oxy acetylene torch.
    Picked up port files for the oxy acetylene torch
         - cleaned up the ports
    Boring drill is OOS with carburetor issues. At
    Eby's Lawn and Garden being fixed.  
    Quarterly check off on WMD trailer
         - GEN 10 wont run off choke. We will be
           taking it next shift to be worked on.
    Fueled RS-20
    Station Choirs complete

    Shift complete
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Tuesday, March 3, 2020

Pass-On

 
 
  Pass-On
 
Date 03-02-2020
Pass-On Subject D-Shift, Monday Match 2nd 2020
Pass-On Information -Gator & Collapse checked

-Apparatus checks

-Found broken pigtail laying in the bottom of the cabinet . Fixed it and put it back on RS20-01's shore line.

-McCoy to DES for meeting

-Training at county highways

-BS20 fueled

-Pump on gator fueled

-Bay blown out

-Salt & plow put away

-3 spare gear racks torn down and placed in the shed

-New wiper blades purchased and put on RS20-01

-MCC2 & Hospital trailer checked
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Monday, March 2, 2020

Pass-On

 
 
  Pass-On
 
Date 03-01-2020
Pass-On Subject C-shift Pass On
Pass-On Information -Rope training complete for C. Fraley.

-Rope and hazmat equipment cleaned up.

-BT20 run from River Bottom to Dam 5, no issues.  

-Weekly on RS20-01 completed with no new issues found.
Name Olson / Fraley
Email EngineDriver71@comcast.net
 
     
 
 

Sunday, March 1, 2020

Pass-On

 
 
  Pass-On
 
Date 02-29-2020
Pass-On Subject Hurst Pump
Pass-On Information Governor spring came of the hurst pump on RS20. Spring was placed back on however it needs replaced. If pump doesn't come out of idle the spring came off again.
Name Benjamin Hoopengardner
Email bhoopengardner@washco-md.net