Sunday, November 24, 2019

Pass-On

 
 
  Pass-On
 
Date 11-24-2019
Pass-On Subject D shift pass on
Pass-On Information Hazmat check completed. meters need to be charged twice a week almost all meters were half charged or almost dead.

house chores were completed.

Olson killed Epstein for the Clinton's
Name Clay Shealy
Email cshealy@washco-md.net
 
     
 
 

Friday, November 22, 2019

Pass-On

 
 
  Pass-On
 
Date 11-22-2019
Pass-On Subject C-shift Pass On
Pass-On Information -New rope placed in service on both RS20 & RS20-01.  Seals placed on bags.

-Rigging and attendant bags for both RS20 & RS20-01 inventoried and seals placed on bags.

-Old rope is in training room.  Will be moved to Phoenix next week.

-Rope log will be kept in station from now on.  Location TBD.

-Silo rescue equipment bag out for repair.  Panels left next to 20-03 if needed.

-Hazmat meters batteries found low.  Charging may have to be twice a week.  

-16" Stihl saw from RS20 found marked OOS.  Repairs made and placed back in service.

-RS20-01 down 1 SCBA cylinder till Monday.  

-Epstein didn't kill himself.
Name Otter
Email enginedriver71@comcast.net
 
     
 
 

Wednesday, November 20, 2019

Pass-On

 
 
  Pass-On
 
Date 11-19-2019
Pass-On Subject D-Shift, Tuesday November 19th 2019
Pass-On Information -McCoy & Hose on at 0400hrs
-Anderson, Fraley, Olson & Shealy to BWI for ARFF
-Grain bin rescue training with HFD
-McCoy out for knox box stuff
-BS20 & BT20 checked
-BS20 fueled
-Grain bin training again
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Monday, November 18, 2019

Pass-On

 
 
  Pass-On
 
Date 11-17-2019
Pass-On Subject B-Shift, Sunday November 17th 2019
Pass-On Information -HM20's meters charged
-RS20-01 checked. 1-cylinder missing(needed to be filled by stairs) 2-cylinders were found empty.
-HM20 washed
-RS20-01 & BS20 inside cabs were cleaned
-2 scba cylinders filled
-6 scba cylinders were placed OOS due to needing hydro tested. 1-30min, 4-45min & 1-60min. There are now 3 cylinders missing from RS20.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Saturday, November 16, 2019

Pass-On

 
 
  Pass-On
 
Date 11-15-2019
Pass-On Subject D-Shift, Friday November 15th 2019
Pass-On Information -Upstairs & downstairs cleaned
-Bay blown out
-RS20 checked
-Apparatus checks
-Meeting at 0900 for knox box stuff
-2-4x4's & 2- 1/2 sheets of plywood placed on collapse
-Station supplies purchased
-New light bulbs put into the burnt out lights (one in bay & one flood light outside the bay). There is still one light that is out in the rear of the bay, it is the light fixture itself that is bad.
-Placed "new" ems supplies in the ems bag on RS20-01. Also switched to a ems style bag. Please go over the supplies in that bag.
-RS20-01 & BS20 fueled
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Friday, November 15, 2019

Pass-On

 
 
  Pass-On
 
Date 11-14-2019
Pass-On Subject C-Shift
Pass-On Information HM-20 and 1820 to ARFF class
Whistles added to harnesses
RS-20, 203, HM fueled
skid of fluff brought over from warehouse
air filters changed
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Wednesday, November 13, 2019

Pass-On

 
 
  Pass-On
 
Date 11-12-2019
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON

Checked equipment and Boats

I-81 N   Fuel spill   HM 20

    Used 25 bags of Sorbent W to contain and
    Absorb the Residual diesel on the roadway.

Restocked Sorbent W

HFD came and took SQ 20 to training. We didn't make it due to the fuel spill.

Station Choirs complete

Structural collapse to Cortland Apartments
    built a Two post shore per the structural
    Engineer on scene.
    Used:
    (4) 4x4x10' posts
    (10) gusset plates
    (2) packs of matched wedges
    (2) full 4x8x1/2" sheets of plywood.
    (4) sticks of framing nails
Replaced:

    (10) gusset plates
    (2)   4x4x10' posts

Told Otter what they needed to buy to replace what we used.

Shift complete.    
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Tuesday, November 12, 2019

Pass-On

 
 
  Pass-On
 
Date 11-11-2019
Pass-On Subject D-Shift, Monday November 11th 2019
Pass-On Information -Collapse & Gator checked. New check off sheets placed in binders.
-Apparatus checks
-Confined space training with HFD.
- SCBA cylinders filled
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Sunday, November 10, 2019

Pass-On

 
 
  Pass-On
 
Date 11-10-2019
Pass-On Subject C-Shift
Pass-On Information Daily Unit checks, no issues

Webbing cut for bags, inventory list typed

201 Checked-light tower O.O.S., one cord reel pulled off for repair

Multi gas cylinder empty, new one is ordered

201 washed, fueled

AED switched with utility 20's due to not having ped pads for AED

Short forms have been added in Appalachian trail map binder temporarily until I can get a metal clip board
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 11-09-2019
Pass-On Subject B-Shift, Saturday November 9th 2019
Pass-On Information -HM20 checked. Meters & Rideye charged
-Apparatus checks
-House chores
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Friday, November 8, 2019

Pass-On

 
 
  Pass-On
 
Date 11-07-2019
Pass-On Subject D-Shift, Thursday November 8th 2019
Pass-On Information -Apparatus checks
-Dryer cleaned out. There was a lot of lint build up in dryer itself. Hose was kinked in the back. New hose installed
-McCoy to confined space training
-Shealy to ARFF class
-DEF filled on Hazmat
-Hazmat rinsed
-BS20 fueled
-Offloaded about 70 gallons of fuel in the yard tank
-Absorbent restocked on Hazmat
-Hazmat fueled
-MES dropped off large ram from RS20-01. It has been repaired
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Wednesday, November 6, 2019

Pass-On

 
 
  Pass-On
 
Date 11-06-2019
Pass-On Subject C-shift Pass On
Pass-On Information -Drivers SCBA on RS20-01 found unhooked.  Please be diligent in placing SCBAs back in service

-C-shift w/ HM20 in ARFF all day

-Sup20-03 weekly completed with no new issues found
Name Otter
Email EngineDriver71@comcast.net
 
     
 
 

Tuesday, November 5, 2019

Pass-On

 
 
  Pass-On
 
Date 11-05-2019
Pass-On Subject B shift pass on
Pass-On Information BS20, Boat 20 checked.

RS 20-01, HM20, U203/Skid20 To 19914 Leitersburg Pike for the building fire.

Remaining booms on back rack used to replaced the used booms.

Tools and air packs on RS20-01 were cleaned and placed back on the unit.

5 gas meter on RS20-01 was calibrated/ charged and placed back on RS 20-01.

RS20-01 Fueled.

Skid 20 and attachments were power washed and returned to the ware house.

trash taken out, station swept.




Name Clay Shealy
Email cshealy@washco-md.net
 
     
 
 

Monday, November 4, 2019

Pass-On

 
 
  Pass-On
 
Date 11-03-2019
Pass-On Subject D-Shift, Sunday November 2nd 2019
Pass-On Information -Pulled con. space equipment off and preformed a function test. Test the com system and tested the coms on all lines.
-Air cart on RS20 is OOS. It will be fixed on C shift. Air cart from Collapse 20 placed on RS20
-RS20-01 checked, light tower still OOS. Meters calibrated and charged
-Some equipment on RS20-01 driver side first compartment was rearranged. Some equipment from the top shelf and the middle shelf was swapped. This is to make the EMS equipment more accessible.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Sunday, November 3, 2019

Pass-On

 
 
  Pass-On
 
Date 11-02-2019
Pass-On Subject C-Shift
Pass-On Information -RS20-01 fueled
-Apparatus checks
-HM20 checked. Meters calibrated and charged. Rid eye charged
-Continued station clean up
-Loaded U203 full of stuff and took the stuff to the warehouse.
-Floors swept and mopped, bay floor blown out, classroom cleaned
-Red boat placed on top of the other boat.
-Removed tote and drum from U203. That is now in the shed.
-Grain bin rescue device placed on U203
-Skid of absorbent placed on U203 for the winter season.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Friday, November 1, 2019

Pass-On

 
 
  Pass-On
 
Date 10-31-2019
Pass-On Subject A SHIFT
Pass-On Information Hose and Poffinberger ON

Equipment and SCBAs checked

Ran all the chainsaws

Patched the transom on BT 20A
    Front left cross over line is leaking. If your    
    using it, simple break the connection in the
    middle of the crossover line and it will hold air
    without problems. If it remains connected it will
    lose air in the front left bow tube over about 2
    hours of time. At this point we are searching
    for a solution but the boat is in service.

Cleaned the Fridge out

Station chores completed

Two cylinders (out of surplus packs from utility 20)
Need filled

Grass was too wet to cut, we will take care of it our next shift.

400 blk Oak ridge Dr.  Fluid spill
2 Box                         House Fire

Shift complete


Name Keith Hose
Email Khose@washco-md.net
Upload Photo F0E4A15C-5A71-4819-824E-FEBA279766BE.jpeg