Sunday, September 29, 2019

Pass-On

 
 
  Pass-On
 
Date 09-28-2019
Pass-On Subject D Shift: Saturday September 28th 2019
Pass-On Information •HM20 checked. Meters calibrated, RAD meter charged.
•McCoy to county stations for Knox Box stuff
•House chores
•RS20-01, Skid20, U203 fueled
•MCC2 picked up from Lowe's and taken back to the warehouse
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Saturday, September 28, 2019

Pass-On

 
 
  Pass-On
 
Date 09-27-2019
Pass-On Subject C-Shift 9-27
Pass-On Information -Weekly completed on RS20 w/ no new issues found

-DEF added to HazMat20

-Rope equipment inventoried and made ready for drill

-Hazmat policies updated

-Rope policy completed
Name Otter
Email EngineDriver71@comcast.net
 
     
 
 

Wednesday, September 25, 2019

Pass-On

 
 
  Pass-On
 
Date 09-24-2019
Pass-On Subject D-Shift: Tuesday September 24th 2019
Pass-On Information -BS20 & BT20 checked. BS20's oil remains high
-Purchased new trailer lights for the rear of the gator trailer (one was out). They've been installed
-RS20-01 fueled
-Removed all the equipment from UT20
-Removed all the decals that needed to be removed. Some areas still need a little work
-Dry suit, PFD and helmet put away. Boots still drying
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Tuesday, September 24, 2019

Pass-On

 
 
  Pass-On
 
Date 09-23-2019
Pass-On Subject C-Shift 9/23/19
Pass-On Information -Hazmat 20 taken to Atlantic for lighting repairs.  No ETA on return.

-1 dry-suit drying in bay from Inc#22152
Name Otter
Email enginedriver71@comcast.net
 
     
 
 

Saturday, September 21, 2019

EDIT: Pass-On

 
 
  Pass-On
 
Date 09-21-2019
Pass-On Subject D-Shift: Friday September 20th 2019
Pass-On Information •Apparatus checks
•Furnace was serviced and cleaned
•To DES
•Garden hose manifold returned
Name Austin McCoy
Email Amccoy@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 09-21-2019
Pass-On Subject D-Shift: Friday September 20th 2019
Pass-On Information •Apparatus checks
•Furnace was serviced and cleaned
•To DES
Name Austin McCoy
Email Amccoy@washco-md.net
 
     
 
 

Friday, September 20, 2019

Pass-On

 
 
  Pass-On
 
Date 09-19-2019
Pass-On Subject C-shift
Pass-On Information Equipment replaced from mvc
garden hose manifold missing from muddy mommas event
grass mowed
airbags not tested yesterday
Name Chris Fraley
Email cfraley@washco-md.net
 
     
 
 

Wednesday, September 18, 2019

Pass-On

 
 
  Pass-On
 
Date 09-17-2019
Pass-On Subject A crew
Pass-On Information Hose and Poffinberger ON

checked BS-20 and Boat 20.
    Washed and waxed BS
    Did motor maintenance on 40/60EFI
   
SCBA's checked and station maintenance completed

Petrogen torch training completed
     Had O2 cylinder refilled

Halfway Blvd just west of I-81  Pump off
     Recovered 300 gallons Diesel
     Had to offload twice at the station
     Replaced all materials used
     Used one wax ring (not replaced)
     Fueled HM-20

HM-20 problems:
     Red compartment open light continues t
     to flash despite all compartment doors
     being closed.
     Blue airline would not keep up with
     drilling operation. Switched to the ports
     and it kept up fine.
     Adapter to SCBA cylinder on the
     pressure control gauge is missing.
     Onboard Hydrocarbon is slow, slower
     then the old pump. We need to be able
     to control the pressure on the pump! The
     simple on/off switch is not adequate.

I am working on the MDE reports, I will turn it in tomorrow. All other paperwork is compete.

Shift complete
     
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Friday, September 13, 2019

Pass-On

 
 
  Pass-On
 
Date 09-12-2019
Pass-On Subject D-Shift: Thursday September 12th 2019
Pass-On Information -Units checked
-Cleaned upstairs and downstairs
-MDE training 0900-1230
-McCoy out for Knox Box stuff
-Lowes run to pick up air filters, new flag and new blinds for upstairs
-RS20-01 fueled
-New flag swapped out with old one
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Thursday, September 12, 2019

Pass-On

 
 
  Pass-On
 
Date 09-11-2019
Pass-On Subject C-Shift
Pass-On Information -203 checked
-MDE class
-BS-20 fueled
-Hazmat review and driving with A. Hopkins
-20-01's meter calibrated
Name Fraley
Email cfraley@washco-md.net
 
     
 
 

Monday, September 9, 2019

Pass-On

 
 
  Pass-On
 
Date 09-08-2019
Pass-On Subject D-Shift: Sunday September 8th 2019
Pass-On Information -RS20-01 checked
-Unit checks at the warehouse
-Brought back a skid of fluff
-RS20-01 & U203 fueled
-McCoy to CO59 for Knox Box stuff
-Grass mowed
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Saturday, September 7, 2019

Re: Apparatus Maintenance Request - Chris Fraley

 
  Apparatus Maintenance Request
 
Name Chris Fraley
Date 09-07-2019
Email cfraley@washco-md.net
Unit RS201
Unit Status In Service
Description of Issue officer's side rear marker light out on top of box
 
     
 
 

Re: Apparatus Maintenance Request - Chris Fraley

 
  Apparatus Maintenance Request
 
Name Chris Fraley
Date 09-07-2019
Email cfraley@washco-md.net
Unit RS20
Unit Status In Service
Description of Issue leaking oil
front marker light out
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 09-07-2019
Pass-On Subject C-Shift
Pass-On Information -Utility 20 O.O.S. bad injector
-203 shuts off after putting it in drive
-RS-20 leaking oil
-Rigging bags organized, request made             for more prusiks
-Hazmat detailed, fueled, and checked
-PID's calibrated, portable radio batteries cycled through charging
Name Fraley
Email cfraley@washco-md.net
 
     
 
 

Thursday, September 5, 2019

Pass-On

 
 
  Pass-On
 
Date 09-04-2019
Pass-On Subject D-Shift: Wednesday September 4th 2019
Pass-On Information -U203 checked
-On scene of high angle rescue all day
-Equipment brought back from call and repacked
-2-300ft rope bags from RS20 are OOS. The 2 from RS20-01 have been moved to RS20. The rope had multiple soft spots in it. The rope is getting ready to expire.
-UT20 & Gator 20 fueled
-24ft extension ladder pick up from CO27 for PAT test
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Monday, September 2, 2019

Pass-On

 
 
  Pass-On
 
Date 09-01-2019
Pass-On Subject A-crew
Pass-On Information Hose/Lyons ON
Apparatus and SCBA checks complete

Equipment familiarization on HM-20 w/ Lyons

HM-20 Drivers Training

Picked up more Wax Rings- only one found on check offs yesterday
Also picked up AAA batteries, we had to replace the batteries in 3 voice-mitters yesterday on hazmat

Petzl ID/repelling training off the beam in station.

Station choirs completed

FIRE CALL-

602 Potomac Ave.   RS 201     House fire

Shift complete
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Sunday, September 1, 2019

Pass-On

 
 
  Pass-On
 
Date 08-31-2019
Pass-On Subject D-Shift: Saturday August 31st 2019
Pass-On Information -HM20 checked
-Light tower on RS20-01 fixed. Appears to be working normally
-RS20-01 washed
-Washington Goes Purple event @ City Park
Name Austin McCoy
Email amccoy@washco-md.net