Tuesday, September 1, 2020

Pass-On

 
 
  Pass-On
 
Date 08-31-2020
Pass-On Subject C-Shift
Pass-On Information Lapel mic for Apex off the boat support is OOS and placed on the cabinet. Radio Maint is aware and has ordered us a new mic. Should be in at the end of the week.

Changes were made to the collapse, email sent.

New check out sheets were placed in binders.

All water equipment placed back on the boat. Missing one throw bag, that left with jefferson 7.

Airpacks are in the training room to try out.
Name Fraley/Hamrick
Email cfraley@washco-md.net
 
     
 
 

Saturday, August 29, 2020

Pass-On

 
 
  Pass-On
 
Date 08-28-2020
Pass-On Subject C-Shift
Pass-On Information Rescue Squad 20 checked

Rope Training

Olson fixed dry suites

Generator picked up from residence

One 30ft piece of webbing (red) missing after high rock call.

Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Tuesday, August 25, 2020

Pass-On

 
 
  Pass-On
 
Date 08-24-2020
Pass-On Subject B Shift Pass On
Pass-On Information -Collapse & Gator weekly completed w/ no issues found.

-Rope training completed w/ Olson, Poff, Hoop, & Anderson.

-New rope equipment will be placed in service this Friday after all personnel have had a chance to train with it.
Name Otter
Email dolson@washco-md.net
 
     
 
 

Monday, August 24, 2020

Pass-On

 
 
  Pass-On
 
Date 08-23-2020
Pass-On Subject A crew
Pass-On Information Hose, Shealy and McCoy ON

Apparatus and SCBA checks completed
Weekly on RS-201
Fueled UT-205 and RS-20

311 Belview Ave.        House Fire     RS-201
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 08-22-2020
Pass-On Subject C- crew
Pass-On Information Hose (OT) and Hamrick ON

apparatus and SCBA checks complete
- boat 20A trailer OOS

HM20 weekly complete

weekly house choirs complete

4 calls:

881 Penn. Ave.           Building Fire     RS-201
6700 Girl Scout Rd.     inaccessible      Gator 20
121 High Street          House Fire       RS-201
Annapolis Rock           Inaccessible      Gator 20

All equipment checked and air filled.
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Friday, August 21, 2020

Pass-On

 
 
  Pass-On
 
Date 08-20-2020
Pass-On Subject A-Shift, Thursday August 20th 2020
Pass-On Information Driver: Hose
Officer: McCoy
3rd: Shealy


•Apparatus checks

•Shealy with HM20 to CO35 for training. 08:20-13:00

•McCoy & Hose worked on rope training. Ascending & descending 0900-1030

•House chores

•Grass mowed

•McCoy & Shealy worked on Boaters Ed 1400-1900


INCIDENTS:

Dual Pl. House fire. Small electrical fire. Placed in service
Name McCoy
Email Amccoy
 
     
 
 

Sunday, August 16, 2020

Pass-On

 
 
  Pass-On
 
Date 08-15-2020
Pass-On Subject B Shift Pass On
Pass-On Information -HM20 weekly completed.  The LCD is still slow to start but is quicker with the survey nozzle installed and not the rain cap.  Recommend this be the standard setup for a faster startup.

-Chlorine Safety (TRANSCAER) and new rope equipment training completed.  New rope equipment training to be conducted 8/17-8/21.

-Assisted Co10 with a CO incident.  Measured 11-15ppm for a 45 minute duration with the MX6 meters.  Both meters were re-calibrated upon return to the station.
Name Otter
Email dolson@washco-md.net