Monday, July 27, 2020

Pass-On

 
 
  Pass-On
 
Date 07-27-2020
Pass-On Subject A Shift Pass-on
Pass-On Information Check off complete on GTR20 and collapse 20.

House chores completed

RS20 to HGR for ARFF training

RS20 fulled

15204 clear spring road for an entrapment canceled enrout.



Name Clay Shealy
Email cshealy@washco-md.net
 
     
 
 

Sunday, July 26, 2020

Pass-On

 
 
  Pass-On
 
Date 07-23-2020
Pass-On Subject C-Shift
Pass-On Information 201-checked, no new issues found.

LCD ran for 6 hours

Fraley to warehouse for PPE inventory

Shelf was cleared off for sets of water equipment in case a large scale flooding event occurs. This set up is just starting, as time goes on this may be changed.

Boat motor didnt run that well on the creek. Couldnt get on plain with shallow water conditions.

Axle on boat 20A's is bent.

Handlight Batterey needs replaced
Name Fraley/Hamrick
Email cfraley@washco-md.net
 
     
 
 

Saturday, July 25, 2020

Pass-On

 
 
  Pass-On
 
Date 07-24-2020
Pass-On Subject A-Shift, Friday July 24th 2020
Pass-On Information -RS20 checked

-Apparatus checks

-BT20A still leaking air

-RS20-01 fueled

-HM20 filled with DEF & fuel


INCIDENTS:

Building fire: Electrical issue

Veh into building: Cancelled

House fire: Electrical issue
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Thursday, July 23, 2020

Pass-On

 
 
  Pass-On
 
Date 07-23-2020
Pass-On Subject C-Shift
Pass-On Information RS-20-meters calibrated, cs equipment put back on, fueled, placed back in service.

RS-20 officer side, center support for awning has been removed

LCD ran for 30 mins, still displays wait

Mercury Overpack materials recovered from club road is in the Hazmat shed in a sealed mini drum. Sam is aware.

201-Driver's airpack was found with heads up display with double green with no air in the system. New regulator placed on pack with same results. Driver's pack moved to seat 3 of unit.

Boat was found low on air. After filling twice front of boat seems soft. Tow anchor reinforcement piece peeled off the boat, temporarily using the rope.

CS tote put back in the shed.

All station air filters changed

 

Name Fraley/Hamrick
Email cfraley@washco-md.net
 
     
 
 

Wednesday, July 22, 2020

Pass-On

 
 
  Pass-On
 
Date 07-21-2020
Pass-On Subject A-Shift, Tuesday July 21st 2020
Pass-On Information -BT20A, BT20C and BS20 checked

-Apparatus checks

-RS20-01 to daycare on Elliott Parkway for Pub Ed

-Gas cans from gray cabinet filled

-LCD 3.3 placed in a case on the hazmat

-Gator fueled

-Training on LCD & Dalgren decon

-House chores

-Boat parts ordered
Name McCoy/Hose
Email amccoy@washco-md.net
 
     
 
 

Tuesday, July 21, 2020

Pass-On

 
 
  Pass-On
 
Date 07-20-2020
Pass-On Subject C-Shift
Pass-On Information Unit checks-Gator and Collapse

LCD meter training-Start meter every morning and let it sample

Dewalt Battery taken off 20-01 after charger read powerline problem.

New unit specific check out sheets will be coming soon!

Squad 20 and Boat 20 still O.O.S.
Name Fraley/Hamrick
Email cfraley@washco-md.net
 
     
 
 

Thursday, July 16, 2020

Pass-On

 
 
  Pass-On
 
Date 07-16-2020
Pass-On Subject B-Shift
Pass-On Information BT-20 taken to DIB.
Chesapeake moved from its trailer to the sled trailer.
Inventoried water rescue equipment.
Name Benjamin E Hoopengardner
Email bhoopengardner@washco-md.net