Thursday, June 25, 2020

Pass-On

 
 
  Pass-On
 
Date 06-25-2020
Pass-On Subject C-Shift
Pass-On Information -Unit checks, 201 meter back on

-All equipment from the drill has been washed, put away and bags sealed.

-201 to warehouse to assist with folding up hospital tents.

-PFD's are in the training room and are numbered. Match your helmet number with the pfd number.

-Olson off/McCoy on duty

-201 to ECC for Scott SCBA presentation

-grass mowed, air filters changed, 201 fueled
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Tuesday, June 23, 2020

Pass-On

 
 
  Pass-On
 
Date 06-22-2020
Pass-On Subject D-Shift, Monday June 22nd 2020
Pass-On Information • Checked the gator and collapse

•Apparatus checks

•Shealy derailed Anderson's vehicle

•McCoy and Anderson to IT (downtown) and Rj Locks


Incidents:

1- Box alarm, cancelled enroute
Name McCoy/Shelay
Email Amccoy
 
     
 
 

Monday, June 22, 2020

Pass-On

 
 
  Pass-On
 
Date 06-21-2020
Pass-On Subject C-Shift
Pass-On Information -Hazmat Rack organized, most of items put in the first shed.

-Lime paced in blue jugs for acids spills

- Rope Training

-201 has one bulb out on the light tower

-HCN gas empty, 201's meter overdue

-Discussed modifying 201 driver's compartment to make it easier for driver to get ppe on.

-Airport response from ops is in the planning phase.
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Saturday, June 20, 2020

Pass-On

 
 
  Pass-On
 
Date 06-19-2020
Pass-On Subject A-Shift, Friday June 19th 2020
Pass-On Information -Apparatus checks and station cleaning

-RS20-01 fueled
Name Poffinberger & Burger/McCoy
Email amccoy
 
     
 
 

Friday, June 19, 2020

Pass-On

 
 
  Pass-On
 
Date 06-18-2020
Pass-On Subject D-Shift, Thursday June 18th 2020
Pass-On Information -Apparatus checks

-Rope training

-RS20-01 & Shealy to HGR for training

-RS20 washed

-Fridge cleaned out

-RS20-01 fueled

-Grass mowed


Incidents:

2-Box alarms. Nothing to them
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Monday, June 15, 2020

Pass-On

 
 
  Pass-On
 
Date 06-14-2020
Pass-On Subject D-Shift, Sunday June 14th 2020
Pass-On Information -RS20-01 checked

-RS20 & BS20 fueled


-Checked WMD trailer

-BS20 washed



Incidents:
-Trail rescue/Cardiac arrest- Only used our manpower

-House fire- No equipment used

-Subj struck by train- No equipment used
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Sunday, June 14, 2020

Pass-On

 
 
  Pass-On
 
Date 06-13-2020
Pass-On Subject C-Shift
Pass-On Information Fuel transferred from tote to yard tank.

Rain coat decon area, inside and outside cleaned up. Metal racks put back in shed. Used coats were placed in trash bags and placed by the decon area for Sam's direction.

Hazmat checked, fueled, and re-gen was performed. Meter B2 HCN readings bounced from -0.1 to 0.1 after zeroing the censors and calibrating. Spare was placed on unit in its place.

After giving Williamsport 14 bags of granular, Sam was notified of remaining supply. He wants the skid from the warehouse brought to the station.

Boat flashlights gathered, one put on charge after call. Flir battery charged.

As dirty N95 masks come in, place them in the training room on the right.

Name Fraley/Olson
Email cfraley@washco-md.net