Saturday, December 7, 2019

EDIT: Pass-On

 
 
  Pass-On
 
Date 12-06-2019
Pass-On Subject A-Crew
Pass-On Information Hose and Poffinberger ON

Quarterly inspection on MCC2 completed
    Couldn't get radios to power up

Skid steer trailer too trailer enterprise for inspection

20mm I-70EB Tractor Trailer accident
    Recovered 100 gallons of fuel
    Cleaned macro filter

Picked up spare keys for boat 20. They are hanging inside the left door of the water rescue cabinet. Also there is another key in the registration holder on the trailer.

Picked up skid steer trailer and returned it to Phoenix.

Company 27 picked up 8 bags of granular

Checked squad 20
    All Dewalt batteries were dead. Cycling them
    Through the chargers.
    SCBA bracket on officier seat is not holding the
    air pack in, without someone sitting there.
    Any suggestions??

SCBA's checked and station choirs completed

PT at PAL

FUELED SQ-20 and 203

SHIFT COMPLETE
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Re: Small Equipment/SCBA Maintenance Request

 
  Small Equipment/SCBA Maintenance Request
 
Date 12-06-2019
Name Keith Hose
Email Khose@washco-md.net
Unit Equipment is Assigned to UT20
Equipment Status In Service
Equipment Replaced With None
Description of Issue MCC2 Trailer

We couldn't get the on board radios to power up.
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 12-06-2019
Pass-On Subject A-Crew
Pass-On Information Hose and Poffinberger ON

Quarterly inspection on MCC2 completed
    Couldn't get radios to power up

Skid steer trailer too trailer enterprise for inspection

20mm I-70EB Tractor Trailer accident
    Recovered 100 gallons of fuel
    Cleaned macro filter

Picked up spare keys for boat 20. They are hanging inside the left door of the water rescue cabinet. Also there is another key in the registration holder on the trailer.

Picked up skid steer trailer and returned it to Phoenix.

Checked squad 20
    All Dewalt batteries were dead. Cycling them
    Through the chargers.
    SCBA bracket on officier seat is not holding the
    air pack in, without someone sitting there.
    Any suggestions??

SCBA's checked and station choirs completed

PT at PAL

FUELED SQ-20 and 203

SHIFT COMPLETE
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Thursday, December 5, 2019

Pass-On

 
 
  Pass-On
 
Date 12-04-2019
Pass-On Subject C-Shift
Pass-On Information -Anderson, Olson, Shealy, Fraley to HGR for training

-Collapse inspected by trailer enterprise

-RIID Eye and meters charged

-203 Checked and fueled with no issues
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Sunday, December 1, 2019

Pass-On

 
 
  Pass-On
 
Date 11-30-2019
Pass-On Subject C-shift Pass On
Pass-On Information -HM20 checked with no new issues found with rig.  Batteries for RIIDEye, MX6 meters, and portable radios all found low.  Will begin to charge all on both Saturday and following Wednesday shift to keep battery levels up.
-Plow checked and ready for Old Man Winter.  Placed in a position to mount on Sup20-03 when needed.
-Organized pile of equipment that was behind RS20.  These items will be moved to Phoenix or placed in their respective location in the station next week.
-2nd pallet jack moved to shed by fuel pump.
Name Otter
Email EngineDriver71@comcast.net
 
     
 
 

Sunday, November 24, 2019

Pass-On

 
 
  Pass-On
 
Date 11-24-2019
Pass-On Subject D shift pass on
Pass-On Information Hazmat check completed. meters need to be charged twice a week almost all meters were half charged or almost dead.

house chores were completed.

Olson killed Epstein for the Clinton's
Name Clay Shealy
Email cshealy@washco-md.net
 
     
 
 

Friday, November 22, 2019

Pass-On

 
 
  Pass-On
 
Date 11-22-2019
Pass-On Subject C-shift Pass On
Pass-On Information -New rope placed in service on both RS20 & RS20-01.  Seals placed on bags.

-Rigging and attendant bags for both RS20 & RS20-01 inventoried and seals placed on bags.

-Old rope is in training room.  Will be moved to Phoenix next week.

-Rope log will be kept in station from now on.  Location TBD.

-Silo rescue equipment bag out for repair.  Panels left next to 20-03 if needed.

-Hazmat meters batteries found low.  Charging may have to be twice a week.  

-16" Stihl saw from RS20 found marked OOS.  Repairs made and placed back in service.

-RS20-01 down 1 SCBA cylinder till Monday.  

-Epstein didn't kill himself.
Name Otter
Email enginedriver71@comcast.net