Friday, November 22, 2019

Pass-On

 
 
  Pass-On
 
Date 11-22-2019
Pass-On Subject C-shift Pass On
Pass-On Information -New rope placed in service on both RS20 & RS20-01.  Seals placed on bags.

-Rigging and attendant bags for both RS20 & RS20-01 inventoried and seals placed on bags.

-Old rope is in training room.  Will be moved to Phoenix next week.

-Rope log will be kept in station from now on.  Location TBD.

-Silo rescue equipment bag out for repair.  Panels left next to 20-03 if needed.

-Hazmat meters batteries found low.  Charging may have to be twice a week.  

-16" Stihl saw from RS20 found marked OOS.  Repairs made and placed back in service.

-RS20-01 down 1 SCBA cylinder till Monday.  

-Epstein didn't kill himself.
Name Otter
Email enginedriver71@comcast.net
 
     
 
 

Wednesday, November 20, 2019

Pass-On

 
 
  Pass-On
 
Date 11-19-2019
Pass-On Subject D-Shift, Tuesday November 19th 2019
Pass-On Information -McCoy & Hose on at 0400hrs
-Anderson, Fraley, Olson & Shealy to BWI for ARFF
-Grain bin rescue training with HFD
-McCoy out for knox box stuff
-BS20 & BT20 checked
-BS20 fueled
-Grain bin training again
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Monday, November 18, 2019

Pass-On

 
 
  Pass-On
 
Date 11-17-2019
Pass-On Subject B-Shift, Sunday November 17th 2019
Pass-On Information -HM20's meters charged
-RS20-01 checked. 1-cylinder missing(needed to be filled by stairs) 2-cylinders were found empty.
-HM20 washed
-RS20-01 & BS20 inside cabs were cleaned
-2 scba cylinders filled
-6 scba cylinders were placed OOS due to needing hydro tested. 1-30min, 4-45min & 1-60min. There are now 3 cylinders missing from RS20.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Saturday, November 16, 2019

Pass-On

 
 
  Pass-On
 
Date 11-15-2019
Pass-On Subject D-Shift, Friday November 15th 2019
Pass-On Information -Upstairs & downstairs cleaned
-Bay blown out
-RS20 checked
-Apparatus checks
-Meeting at 0900 for knox box stuff
-2-4x4's & 2- 1/2 sheets of plywood placed on collapse
-Station supplies purchased
-New light bulbs put into the burnt out lights (one in bay & one flood light outside the bay). There is still one light that is out in the rear of the bay, it is the light fixture itself that is bad.
-Placed "new" ems supplies in the ems bag on RS20-01. Also switched to a ems style bag. Please go over the supplies in that bag.
-RS20-01 & BS20 fueled
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Friday, November 15, 2019

Pass-On

 
 
  Pass-On
 
Date 11-14-2019
Pass-On Subject C-Shift
Pass-On Information HM-20 and 1820 to ARFF class
Whistles added to harnesses
RS-20, 203, HM fueled
skid of fluff brought over from warehouse
air filters changed
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Wednesday, November 13, 2019

Pass-On

 
 
  Pass-On
 
Date 11-12-2019
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON

Checked equipment and Boats

I-81 N   Fuel spill   HM 20

    Used 25 bags of Sorbent W to contain and
    Absorb the Residual diesel on the roadway.

Restocked Sorbent W

HFD came and took SQ 20 to training. We didn't make it due to the fuel spill.

Station Choirs complete

Structural collapse to Cortland Apartments
    built a Two post shore per the structural
    Engineer on scene.
    Used:
    (4) 4x4x10' posts
    (10) gusset plates
    (2) packs of matched wedges
    (2) full 4x8x1/2" sheets of plywood.
    (4) sticks of framing nails
Replaced:

    (10) gusset plates
    (2)   4x4x10' posts

Told Otter what they needed to buy to replace what we used.

Shift complete.    
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Tuesday, November 12, 2019

Pass-On

 
 
  Pass-On
 
Date 11-11-2019
Pass-On Subject D-Shift, Monday November 11th 2019
Pass-On Information -Collapse & Gator checked. New check off sheets placed in binders.
-Apparatus checks
-Confined space training with HFD.
- SCBA cylinders filled
Name Austin McCoy
Email amccoy@washco-md.net