Wednesday, November 13, 2019

Pass-On

 
 
  Pass-On
 
Date 11-12-2019
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON

Checked equipment and Boats

I-81 N   Fuel spill   HM 20

    Used 25 bags of Sorbent W to contain and
    Absorb the Residual diesel on the roadway.

Restocked Sorbent W

HFD came and took SQ 20 to training. We didn't make it due to the fuel spill.

Station Choirs complete

Structural collapse to Cortland Apartments
    built a Two post shore per the structural
    Engineer on scene.
    Used:
    (4) 4x4x10' posts
    (10) gusset plates
    (2) packs of matched wedges
    (2) full 4x8x1/2" sheets of plywood.
    (4) sticks of framing nails
Replaced:

    (10) gusset plates
    (2)   4x4x10' posts

Told Otter what they needed to buy to replace what we used.

Shift complete.    
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Tuesday, November 12, 2019

Pass-On

 
 
  Pass-On
 
Date 11-11-2019
Pass-On Subject D-Shift, Monday November 11th 2019
Pass-On Information -Collapse & Gator checked. New check off sheets placed in binders.
-Apparatus checks
-Confined space training with HFD.
- SCBA cylinders filled
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Sunday, November 10, 2019

Pass-On

 
 
  Pass-On
 
Date 11-10-2019
Pass-On Subject C-Shift
Pass-On Information Daily Unit checks, no issues

Webbing cut for bags, inventory list typed

201 Checked-light tower O.O.S., one cord reel pulled off for repair

Multi gas cylinder empty, new one is ordered

201 washed, fueled

AED switched with utility 20's due to not having ped pads for AED

Short forms have been added in Appalachian trail map binder temporarily until I can get a metal clip board
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 11-09-2019
Pass-On Subject B-Shift, Saturday November 9th 2019
Pass-On Information -HM20 checked. Meters & Rideye charged
-Apparatus checks
-House chores
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Friday, November 8, 2019

Pass-On

 
 
  Pass-On
 
Date 11-07-2019
Pass-On Subject D-Shift, Thursday November 8th 2019
Pass-On Information -Apparatus checks
-Dryer cleaned out. There was a lot of lint build up in dryer itself. Hose was kinked in the back. New hose installed
-McCoy to confined space training
-Shealy to ARFF class
-DEF filled on Hazmat
-Hazmat rinsed
-BS20 fueled
-Offloaded about 70 gallons of fuel in the yard tank
-Absorbent restocked on Hazmat
-Hazmat fueled
-MES dropped off large ram from RS20-01. It has been repaired
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Wednesday, November 6, 2019

Pass-On

 
 
  Pass-On
 
Date 11-06-2019
Pass-On Subject C-shift Pass On
Pass-On Information -Drivers SCBA on RS20-01 found unhooked.  Please be diligent in placing SCBAs back in service

-C-shift w/ HM20 in ARFF all day

-Sup20-03 weekly completed with no new issues found
Name Otter
Email EngineDriver71@comcast.net
 
     
 
 

Tuesday, November 5, 2019

Pass-On

 
 
  Pass-On
 
Date 11-05-2019
Pass-On Subject B shift pass on
Pass-On Information BS20, Boat 20 checked.

RS 20-01, HM20, U203/Skid20 To 19914 Leitersburg Pike for the building fire.

Remaining booms on back rack used to replaced the used booms.

Tools and air packs on RS20-01 were cleaned and placed back on the unit.

5 gas meter on RS20-01 was calibrated/ charged and placed back on RS 20-01.

RS20-01 Fueled.

Skid 20 and attachments were power washed and returned to the ware house.

trash taken out, station swept.




Name Clay Shealy
Email cshealy@washco-md.net